Revision history of "Extension and reconstruction of DW No. 167 – ul. Wladyslaw IV in Koszalin on the section from the roundabout gen. St. Maczka to the junction of the S-6 expressway" (Q138038)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:3018:30, 9 October 2024DG Regio talk contribs 80,575 bytes 0 Changed label, description and/or aliases in pt
  • curprev 18:3018:30, 9 October 2024DG Regio talk contribs 80,575 bytes +43 Set a claim value: summary (P836): O projeto inclui a extensão e reconstrução de um troço de 1,45 km da estrada provincial n.o 167 a partir de ul. Wladyslaw IV na secção da Gen da rotunda. St. Maczka até à junção da via rápida S-6 “Koszalin-Leste”. A estrada foi projetada com duas estradas de duas pistas, separadas por uma faixa de vegetação, caminhos de bicicleta de duas vias, construção de 8 baías de ônibus com abrigos de ônibus, circuito de ônibus, estradas de serviço, lugares de...

7 March 2024

15 January 2024

10 June 2023

24 May 2023

2 March 2023

  • curprev 20:3420:34, 2 March 2023DG Regio talk contribs 78,135 bytes −1,270 Changed label, description and/or aliases in lv, it, da, sk, ga, es, sl, et, hr, ro, fi, sv, el, cs, fr, lt, bg, de, pt, nl, hu, mt, and other parts

27 October 2022

26 October 2022

21 October 2022

27 July 2022

  • curprev 18:3218:32, 27 July 2022DG Regio talk contribs 77,299 bytes +49,654 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 22:0322:03, 2 December 2021DG Regio talk contribs 16,441 bytes +2,691 Created claim: summary (P836): Le projet comprend l’extension et la reconstruction de 1,45 km de tronçon de la route de voïvodie no 167 à partir d’ul. Władysława IV sur la section du rond-point gen. St. Maczka à la jonction de l’autoroute S-6 «Koszalin-Est». La route a été conçue avec deux chaussées à deux voies, une voie verte séparée, des pistes cyclables bidirectionnelles, la construction de 8 baies d’autobus avec arrêts, boucle d’autobus, routes de service, places de stat...
  • curprev 22:0322:03, 2 December 2021DG Regio talk contribs 13,750 bytes +222 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:4819:48, 21 October 2020DG Regio talk contribs 13,967 bytes +224 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:4819:48, 21 October 2020DG Regio talk contribs 13,743 bytes −205 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:4819:48, 21 October 2020DG Regio talk contribs 13,948 bytes +2,460 Created claim: summary (P836): The project includes the extension and reconstruction of a 1.45 km section of the provincial road no. 167 from ul. Wladyslaw IV on the section from the roundabout gen. St. Maczka to the junction of the S-6 “Koszalin-East” expressway. The road was designed with two two-lane roads, separated by a strip of greenery, two-way walk-bike paths, construction of 8 bus bays with bus shelters, bus loop, service roads, parking spaces, bay for weighing vehic...
  • curprev 19:4819:48, 21 October 2020DG Regio talk contribs 11,488 bytes −2,017 Removed claim: summary (P836): The project involves the extension and upgrading of 1.45 km of section of provincial road No 167 from ul. Władysław IV from the roundabout ST. Matera to the S-6 ‘Koszalin — East’ junction of the S- expressway. The road is designed to be a two-lane carriageway with a two-lane yard, a green split belt, a two-way pedestrian/bicycle path, the construction of 8 bus bays with bus shelters, bus loops, maintenance roads, parking areas, bays for weighi...

24 September 2020

23 June 2020

11 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 21:2921:29, 10 March 2020DG Regio talk contribs 12,220 bytes +2,017 Created claim: summary (P836): The project involves the extension and upgrading of 1.45 km of section of provincial road No 167 from ul. Władysław IV from the roundabout ST. Matera to the S-6 ‘Koszalin — East’ junction of the S- expressway. The road is designed to be a two-lane carriageway with a two-lane yard, a green split belt, a two-way pedestrian/bicycle path, the construction of 8 bus bays with bus shelters, bus loops, maintenance roads, parking areas, bays for weighing...

25 February 2020

18 February 2020

31 January 2020

14 January 2020