Revision history of "Construction of a kayaking trail on Lake Łętowski, together with the necessary infrastructure and marking" (Q137994)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 04:1804:18, 11 October 2024DG Regio talk contribs 46,698 bytes +16 Changed label, description and/or aliases in pt
  • curprev 04:1804:18, 11 October 2024DG Regio talk contribs 46,682 bytes +50 Set a claim value: summary (P836): O projeto tem por objeto a construção da infraestrutura do trilho de caiaque no lago Łętowski, juntamente com as infraestruturas necessárias e a marcação nas instalações das parcelas n.os 172/1 e 416, na região de Łętowo. Estão previstas as seguintes etapas no âmbito das obras: Documentação de projecto, obras de construção e montagem na área do Lago Łętowski.

22 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 20:3420:34, 2 March 2023DG Regio talk contribs 43,458 bytes −1,500 Changed label, description and/or aliases in lv, ro, fr, it, da, el, fi, es, cs, et, ga, sk, lt, hr, hu, de, sv, pt, bg, nl, sl, mt, and other parts

27 October 2022

26 October 2022

21 October 2022

3 July 2022

  • curprev 01:2301:23, 3 July 2022DG Regio talk contribs 42,835 bytes +25,107 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 22:0822:08, 2 December 2021DG Regio talk contribs 12,264 bytes +1,211 Created claim: summary (P836): L’objet du projet est la construction de l’infrastructure de la route de kayak sur le lac Łętowski ainsi que l’infrastructure nécessaire et le marquage sur les parcelles nos 172/1 et 416,obręb Łętowo.Dans le cadre des travaux, il est prévu d’effectuer les travaux de conception, de construction et d’assemblage suivants etapy:Dokumentacja dans le secteur du lac Łętowski., translated_summary
  • curprev 22:0822:08, 2 December 2021DG Regio talk contribs 11,053 bytes +175 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:4219:42, 21 October 2020DG Regio talk contribs 11,317 bytes +167 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:4219:42, 21 October 2020DG Regio talk contribs 11,150 bytes −157 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:4219:42, 21 October 2020DG Regio talk contribs 11,307 bytes +1,203 Created claim: summary (P836): The subject of the project is the construction of the infrastructure of the kayaking trail on Lake Łętowski, together with the necessary infrastructure and marking on the premises of plots no.172/1 and 416, Łętowo region.The following steps are planned to be carried out as part of the works: Design documentation, construction and assembly works in the area of Lake Łętowski., translated_summary
  • curprev 19:4219:42, 21 October 2020DG Regio talk contribs 10,104 bytes −679 Removed claim: summary (P836): The project involves the construction of a bridge infrastructure on the Łętowy lake with the necessary infrastructure and marking in the area of parcels 172/1 and 416, and the following steps are planned to be carried out: the design documentation, construction and assembly works in the Łętowsky Lake., remove_old_english_translation

24 September 2020

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:1010:10, 11 March 2020DG Regio talk contribs 9,495 bytes +679 Created claim: summary (P836): The project involves the construction of a bridge infrastructure on the Łętowy lake with the necessary infrastructure and marking in the area of parcels 172/1 and 416, and the following steps are planned to be carried out: the design documentation, construction and assembly works in the Łętowsky Lake., Adding English summary

25 February 2020

18 February 2020

31 January 2020

14 January 2020