Revision history of "Development of multifunctional recreational infrastructure by reconstructing the medieval castle in Moryń and adapting it to recreational and tourist activities" (Q137989)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 05:4805:48, 10 October 2024DG Regio talk contribs 79,726 bytes +21 Changed label, description and/or aliases in pt
  • curprev 05:4805:48, 10 October 2024DG Regio talk contribs 79,705 bytes +17 Set a claim value: summary (P836): O objetivo do projeto é reconstruir o local histórico e o tempo da fortificação medieval, castelo e sub-zamb em Moryń e adaptá-lo para fins educativos, de exposição e apresentação, na medida do necessário para oferecer serviços turísticos e recreativos resultantes diretamente da nova utilização e desenvolvimento de recursos endógenos. A necessidade de executar o projeto deve-se ao desfasamento entre as infraestruturas existentes e as necessidades at...

22 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

21 October 2022

3 July 2022

  • curprev 01:2301:23, 3 July 2022DG Regio talk contribs 74,095 bytes +47,794 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 22:0822:08, 2 December 2021DG Regio talk contribs 16,035 bytes +2,413 Created claim: summary (P836): L’objectif du projet est de reconstruire le lieu et le temps du château médiéval, du château et du château de Moryń et de l’adapter à des fins éducatives, d’exposition et de présentation dans la mesure nécessaire pour offrir des services touristiques et récréatifs résultant directement de l’utilisation et de la gestion nouvelles de ressources endogènes. La nécessité du projet résulte du manque d’adaptation de l’infrastructure existante aux besoi...
  • curprev 22:0722:07, 2 December 2021DG Regio talk contribs 13,622 bytes +243 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:4219:42, 21 October 2020DG Regio talk contribs 13,818 bytes +221 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:4219:42, 21 October 2020DG Regio talk contribs 13,597 bytes −237 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:4219:42, 21 October 2020DG Regio talk contribs 13,834 bytes +2,333 Created claim: summary (P836): The aim of the project is to reconstruct the historical place and time of the medieval fortification, castle castle and sub-zamb in Moryń and adapt it to educational, exhibition and presentation purposes to the extent necessary to offer tourist and recreational services resulting directly from the new use and development of endogenous resources. The need to implement the project is due to the mismatch of existing infrastructure to the current ne...
  • curprev 19:4219:42, 21 October 2020DG Regio talk contribs 11,501 bytes −1,946 Removed claim: summary (P836): The purpose of the project is to reconstruct the historical reconstruction of the place and time of the medieval bulkhead, the breech of the castle and the receiver in Moryń, and to adapt it for educational, exhibition and demonstration purposes to the extent necessary to offer tourist and leisure services arising directly from the new use and development of endogenous resources. The need to implement the project is due to the inadequacy of th...

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:1010:10, 11 March 2020DG Regio talk contribs 12,153 bytes +1,946 Created claim: summary (P836): The purpose of the project is to reconstruct the historical reconstruction of the place and time of the medieval bulkhead, the breech of the castle and the receiver in Moryń, and to adapt it for educational, exhibition and demonstration purposes to the extent necessary to offer tourist and leisure services arising directly from the new use and development of endogenous resources. The need to implement the project is due to the inadequacy of the...

25 February 2020

18 February 2020

31 January 2020

14 January 2020