Revision history of "Preservation of cultural heritage through the renovation and maintenance of the church The Assumption of the Blessed Virgin Mary in Gryfice" (Q137941)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:2606:26, 9 October 2024DG Regio talk contribs 87,518 bytes −8 Changed label, description and/or aliases in pt
  • curprev 06:2606:26, 9 October 2024DG Regio talk contribs 87,526 bytes +45 Set a claim value: summary (P836): Implementação do projeto Mon. Preservação do património cultural através da renovação e manutenção da igreja A Assunção da Santíssima Virgem em Gryfice" está estacionária e incluirá as seguintes atividades: 1. Construção de isolamento vertical das paredes das fundações em torno da igreja, 1.1 Criação de isolamento vertical das paredes das fundações, correção do nível do solo, fotografia da banda, 1.2 Realização de isolamento vertical das paredes das...

22 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 20:3420:34, 2 March 2023DG Regio talk contribs 84,307 bytes +413 Changed label, description and/or aliases in lv, it, ro, da, fr, sv, ga, hu, sk, bg, nl, fi, de, mt, es, el, sl, et, lt, cs, hr, pt, and other parts

27 October 2022

26 October 2022

21 October 2022

3 July 2022

  • curprev 01:2101:21, 3 July 2022DG Regio talk contribs 81,774 bytes +52,614 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 22:0622:06, 2 December 2021DG Regio talk contribs 17,104 bytes +2,868 Created claim: summary (P836): Mise en œuvre du projet intitulé «Préservation du patrimoine culturel par la rénovation et la conservation de l’église L’Assomption de la Bienheureuse Vierge Marie à Gryfice" est stationnaire et comprendra les activités suivantes: 1. Isolation verticale des murs de fondation autour de l’église, 1.1 Mise en œuvre de l’isolation verticale des murs de fondation, correction du niveau du terrain, photo de la bande, 1.2 L’exécution de l’isolation vert...
  • curprev 22:0622:06, 2 December 2021DG Regio talk contribs 14,236 bytes +207 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:4119:41, 21 October 2020DG Regio talk contribs 14,468 bytes +199 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:4119:41, 21 October 2020DG Regio talk contribs 14,269 bytes −174 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:4119:41, 21 October 2020DG Regio talk contribs 14,443 bytes +2,708 Created claim: summary (P836): Implementation of the project Mon. Preservation of cultural heritage through the renovation and maintenance of the church The Assumption of the Blessed Virgin in Gryfice" is stationary and will include the following activities: 1. Construction of vertical insulation of foundation walls around the church, 1.1 Creation of vertical insulation of the foundation walls, correction of the ground level, photo of the band, 1.2 Performation of vertical in...
  • curprev 19:4119:41, 21 October 2020DG Regio talk contribs 11,735 bytes −2,183 Removed claim: summary (P836): Implementation of the project: “Conservation of cultural heritage through the renovation and maintenance of the Church of the Church The Assumption Day is a stationary date and will include the following activities: 1. The vertical insulation of fundamental walls around the church, 1.1 of the vertical insulation of fundamental walls, the adjustment of the terrain level, the band photo, 1.2 execution of the vertical isolation of the central wal...

25 September 2020

24 September 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:0910:09, 11 March 2020DG Regio talk contribs 12,628 bytes +2,183 Created claim: summary (P836): Implementation of the project: “Conservation of cultural heritage through the renovation and maintenance of the Church of the Church The Assumption Day is a stationary date and will include the following activities: 1. The vertical insulation of fundamental walls around the church, 1.1 of the vertical insulation of fundamental walls, the adjustment of the terrain level, the band photo, 1.2 execution of the vertical isolation of the central wall...

25 February 2020

18 February 2020

31 January 2020

14 January 2020