Revision history of "Construction of sanitary sewerage including sewage treatment and pumping in the village: Bystrzyna and Dobrowola, Świdwin" (Q137913)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:2606:26, 9 October 2024DG Regio talk contribs 93,096 bytes −53 Changed label, description and/or aliases in pt
  • curprev 06:2606:26, 9 October 2024DG Regio talk contribs 93,149 bytes +44 Set a claim value: summary (P836): O projeto realizado pelo município de Świdwin tem por objeto a construção de um sistema de esgotos sanitários, juntamente com duas estações de bombagem e uma estação de tratamento de águas residuais, que assegura a neutralização das águas residuais na zona de Bystrzyna e Dobrowola. Período de execução do projecto: desde 26.6.2017. — 31.12.2019 A execução do projeto prevê a realização de uma tarefa: construção de um sistema de esgotos sanitários na z...

7 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 20:3320:33, 2 March 2023DG Regio talk contribs 89,931 bytes +240 Changed label, description and/or aliases in da, it, sk, et, fi, ga, hr, es, lt, hu, ro, pt, fr, lv, bg, sv, el, nl, de, sl, mt, cs, and other parts

27 October 2022

26 October 2022

21 October 2022

27 July 2022

  • curprev 18:3118:31, 27 July 2022DG Regio talk contribs 87,569 bytes +56,811 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 22:0422:04, 2 December 2021DG Regio talk contribs 17,724 bytes +3,221 Created claim: summary (P836): L’objet du projet mis en œuvre par la municipalité de Świdwin est la construction d’un système d’assainissement sanitaire, ainsi que de deux stations de pompage et d’une station d’épuration des eaux usées, assurant la neutralisation des eaux usées domestiques dans les villes de Bystrzyna et Dobrowola. Durée du projet: depuis le 26.6.2017 — 31.12.2019 Dans le cadre de la mise en œuvre du projet, il est envisagé de mener à bien la tâche suivante:...
  • curprev 22:0422:04, 2 December 2021DG Regio talk contribs 14,503 bytes +214 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:4019:40, 21 October 2020DG Regio talk contribs 14,728 bytes +182 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:4019:40, 21 October 2020DG Regio talk contribs 14,546 bytes −231 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:4019:40, 21 October 2020DG Regio talk contribs 14,777 bytes +2,874 Created claim: summary (P836): The object of the project carried out by the Świdwin Municipality is the construction of sanitary sewage system, together with two pumping plants and a sewage treatment plant, which ensures the neutralisation of the waste water in the area of Bystrzyna and Dobrowola. Period of implementation of the project: since 26.06.2017. — 31.12.2019 The implementation of the project envisages carrying out a task: construction of sanitary sewage system in th...
  • curprev 19:4019:40, 21 October 2020DG Regio talk contribs 11,903 bytes −2,424 Removed claim: summary (P836): The project carried out by the Municipality of Świdwin consists of the construction of a sewage system together with two pumping stations and a waste water treatment plant, ensuring the neutralisation of domestic waste water in the area of Bystrosna and the Voluntary. Duration of the project: from 26.06.2017 — 31.12.2019 The project will carry out a task: construction of the sanitary sewerage network in the area of Bystrosna and Voluntary. The...

24 September 2020

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:1410:14, 11 March 2020DG Regio talk contribs 13,040 bytes +2,424 Created claim: summary (P836): The project carried out by the Municipality of Świdwin consists of the construction of a sewage system together with two pumping stations and a waste water treatment plant, ensuring the neutralisation of domestic waste water in the area of Bystrosna and the Voluntary. Duration of the project: from 26.06.2017 — 31.12.2019 The project will carry out a task: construction of the sanitary sewerage network in the area of Bystrosna and Voluntary. The p...

25 February 2020

18 February 2020

31 January 2020

14 January 2020