Revision history of "Construction of sanitary sewage system in Granowo." (Q137903)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 20:3320:33, 2 March 2023DG Regio talk contribs 75,626 bytes −602 Changed label, description and/or aliases in it, da, et, fi, sk, hr, es, lt, hu, ro, ga, pt, lv, fr, bg, sv, nl, el, cs, sl, de, mt, and other parts

27 October 2022

26 October 2022

21 October 2022

3 July 2022

  • curprev 01:1901:19, 3 July 2022DG Regio talk contribs 74,102 bytes +47,377 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 22:0622:06, 2 December 2021DG Regio talk contribs 16,098 bytes +2,700 Created claim: summary (P836): L’objet du projet est la construction d’un réseau d’assainissement par gravité-pression d’une longueur totale de 4 183 m à Granowo, ainsi que la modernisation de la station de pompage des eaux usées, le raccordement des eaux usées à la propriété (à la frontière du terrain), les raccordements électriques, le raccordement du réseau à la station d’épuration existante. Grâce à l’investissement, un réseau d’assainissement sanitaire d’une longueur de...
  • curprev 22:0622:06, 2 December 2021DG Regio talk contribs 13,398 bytes +128 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:3719:37, 21 October 2020DG Regio talk contribs 13,709 bytes +109 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:3719:37, 21 October 2020DG Regio talk contribs 13,600 bytes −113 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:3719:37, 21 October 2020DG Regio talk contribs 13,713 bytes +2,380 Created claim: summary (P836): The subject of the project is the construction of a gravitational and pressing sanitary sewage system with a total length of 4183 m in Granowo with modernisation of the sewage pumping plant, sewage connections to the property (to the edge of the plot), electrical connections, network connections to the existing sewage treatment plant. As a result of the investment, a sanitary sewer system with a length of 4183 m will be built (length of gravity...
  • curprev 19:3719:37, 21 October 2020DG Regio talk contribs 11,333 bytes −1,930 Removed claim: summary (P836): The object of the project is the construction of a gravitational sewage system with a total length of 4 183 m in Granowo, with the modernisation of the pumping station, sewage connections to the one (up to the boundary of the plot), electric connections, network connections to the existing sewage treatment plant. As a result of the investment, a sewerage network with a length of 4 183 m (gravity channel length 2 982.4 m, length of sewage sewer...

24 September 2020

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:1410:14, 11 March 2020DG Regio talk contribs 11,980 bytes +1,930 Created claim: summary (P836): The object of the project is the construction of a gravitational sewage system with a total length of 4 183 m in Granowo, with the modernisation of the pumping station, sewage connections to the one (up to the boundary of the plot), electric connections, network connections to the existing sewage treatment plant. As a result of the investment, a sewerage network with a length of 4 183 m (gravity channel length 2 982.4 m, length of sewage sewers...

25 February 2020

18 February 2020

31 January 2020

14 January 2020