Revision history of "Construction of sanitary sewage and gravitational sewage system together with pumping stations in the village of Warnino, Gm. Tychowo." (Q137901)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 05:4805:48, 10 October 2024DG Regio talk contribs 82,586 bytes +13 Changed label, description and/or aliases in pt
  • curprev 05:4805:48, 10 October 2024DG Regio talk contribs 82,573 bytes −319 Set a claim value: summary (P836): O projeto tem em conta uma ação de investimento, ou seja, a construção de redes de esgotos sanitários e tubagens de drenagem sob pressão, juntamente com estações de bombagem de drenagem localizadas na aldeia de Warnino, gm. Tychowo. As estações de bombeamento projetadas são objetos selados. As bombas pretendidas não requerem o uso de equipamento de moagem adicional para peças sólidas em esgoto sanitário. Por conseguinte, não é necessário designar um...

7 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 21:5221:52, 2 March 2023DG Regio talk contribs 79,718 bytes −84 Changed label, description and/or aliases in da, it, sk, fr, nl, fi, el, ga, et, pt, sl, sv, es, ro, lt, de, cs, mt, hu, bg, lv, hr, and other parts

27 October 2022

26 October 2022

21 October 2022

3 July 2022

  • curprev 01:1901:19, 3 July 2022DG Regio talk contribs 77,670 bytes +48,665 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 22:0622:06, 2 December 2021DG Regio talk contribs 17,197 bytes +3,079 Created claim: summary (P836): Le projet tient compte d’une activité d’investissement, à savoir la construction d’un réseau d’assainissement par gravité et de canalisations d’évacuation du réseau d’assainissement sous pression ainsi que des stations de pompage des eaux usées situées dans la municipalité de Varnino, Tychowo.Système d’assainissement sanitaire conçu pour les eaux usées domestiques et économiques, sera intégré conformément aux conditions techniques de raccordemen...
  • curprev 22:0622:06, 2 December 2021DG Regio talk contribs 14,118 bytes +180 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:3719:37, 21 October 2020DG Regio talk contribs 14,377 bytes +194 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:3719:37, 21 October 2020DG Regio talk contribs 14,183 bytes −167 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:3719:37, 21 October 2020DG Regio talk contribs 14,350 bytes +2,385 Created claim: summary (P836): The project takes into account one investment action, i.e. construction of sanitary sewerage networks and pressure drainage pipes together with drainage pumping plants located in the village of Warnino, gm. Tychowo.Designed sanitary sewage drainage system of domestic and economic sewage, will be incorporated in accordance with the issued technical conditions of connection to the existing sanitary sewerage system. The designed pumping stations ar...
  • curprev 19:3719:37, 21 October 2020DG Regio talk contribs 11,965 bytes −2,206 Removed claim: summary (P836): The project takes into account one of the investments, i.e. the construction of a gravity sewerage network and a pressure sewage system located in the town of Warnino, a water sewage system located in the village of Warnino, which will be incorporated in the existing sewage treatment plant in the Typhoso.. the gravity and pressure sewage system will be included in the underground wastewater treatment plant. the two sewage pumping stations requ...

24 September 2020

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:1410:14, 11 March 2020DG Regio talk contribs 12,884 bytes +2,206 Created claim: summary (P836): The project takes into account one of the investments, i.e. the construction of a gravity sewerage network and a pressure sewage system located in the town of Warnino, a water sewage system located in the village of Warnino, which will be incorporated in the existing sewage treatment plant in the Typhoso.. the gravity and pressure sewage system will be included in the underground wastewater treatment plant. the two sewage pumping stations requir...

25 February 2020

18 February 2020

31 January 2020

14 January 2020