Revision history of "Modernisation of the water supply network in the City and the People’s Municipality – stage I construction and modernisation of the SUW with water supply" (Q137894)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:2606:26, 9 October 2024DG Regio talk contribs 83,980 bytes −21 Changed label, description and/or aliases in pt
  • curprev 06:2606:26, 9 October 2024DG Regio talk contribs 84,001 bytes −663 Set a claim value: summary (P836): O projeto tem por objeto a ampliação e reconstrução da captação de água com a estação de tratamento de água (SUW-1) em Człopa, a reconstrução e construção da rede de abastecimento de água no troço a partir do m. Człopa-Trzebin-Drzonowo gm.Gestão em modo «conceção e construção» — fase I de construção e modernização do SUW juntamente com obras hidráulicas. O âmbito do investimento deve incluir a reconstrução e expansão do SUU. Sandy em Człopa e constr...

23 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 18:4918:49, 2 March 2023DG Regio talk contribs 81,490 bytes +12,871 Changed label, description and/or aliases in sl, lv, hr, fi, nl, pt, de, fr, hu, es, it, el, sv, et, mt, ro, ga, sk, cs, da, bg, lt, and other parts

27 October 2022

26 October 2022

21 October 2022

27 July 2022

  • curprev 18:3118:31, 27 July 2022DG Regio talk contribs 66,502 bytes +39,297 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 22:0522:05, 2 December 2021DG Regio talk contribs 16,081 bytes +2,736 Created claim: summary (P836): L’objet du projet est l’extension et la reconstruction de la station de captage et de traitement de l’eau (SUW-1) à Człopa, la reconstruction et la construction du réseau d’approvisionnement en eau sur le tronçon de la ville de Człopa-Trzebin-Drzonowo gm. Le mode «conception et construction» — phase I de construction et de modernisation de la SUW ainsi que l’approvisionnement en eau.L’investissement vise à inclure la reconstruction et l’expansio...
  • curprev 22:0522:05, 2 December 2021DG Regio talk contribs 13,345 bytes +244 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:3719:37, 21 October 2020DG Regio talk contribs 13,540 bytes +217 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:3719:37, 21 October 2020DG Regio talk contribs 13,323 bytes −212 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:3719:37, 21 October 2020DG Regio talk contribs 13,535 bytes +2,028 Created claim: summary (P836): The subject of the project is the extension and reconstruction of the water intake with the water treatment station (SUW-1) in Człopa, the reconstruction and construction of the water supply network on the section from the m. Człopa-Trzebin-Drzonowo gm.Management in “design and build” mode – stage I construction and modernisation of the SUW together with waterworks.The scope of the investment is to include the reconstruction and expansion of the...
  • curprev 19:3719:37, 21 October 2020DG Regio talk contribs 11,507 bytes −1,073 Removed claim: summary (P836): The project concerns the extension and reconstruction of the water intake along with the water treatment plant (SG-1) in the village of Cscrap, reconstruction and construction of the water supply network on the section from m. Construction of water supply network L = 4.1 km from m. 3 rd Trzeb- Droztonowo, but also the reconstruction of the water supply network of the ratio of the ratio between Cdeposit and Delpa-Dztonowo by dL = 2.5 km. (there...

24 September 2020

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:1410:14, 11 March 2020DG Regio talk contribs 11,299 bytes +1,073 Created claim: summary (P836): The project concerns the extension and reconstruction of the water intake along with the water treatment plant (SG-1) in the village of Cscrap, reconstruction and construction of the water supply network on the section from m. Construction of water supply network L = 4.1 km from m. 3 rd Trzeb- Droztonowo, but also the reconstruction of the water supply network of the ratio of the ratio between Cdeposit and Delpa-Dztonowo by dL = 2.5 km. (therefo...

25 February 2020

18 February 2020

31 January 2020

14 January 2020