Revision history of "Construction of a distribution water supply system in Okrągła Street in the town of Wapnica" (Q137893)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:5015:50, 7 October 2024DG Regio talk contribs 83,487 bytes +13 Changed label, description and/or aliases in pt
  • curprev 15:5015:50, 7 October 2024DG Regio talk contribs 83,474 bytes −24 Set a claim value: summary (P836): O projeto tem por objeto a construção de uma rede de distribuição de água com ligações na cidade de Wapnica – ul.Okrągła. O sistema de abastecimento de água permitirá o abastecimento de água de edifícios residenciais existentes e áreas adjacentes para habitação. A equipa de execução, contabilidade e avaliação do projeto será responsável pela execução do projeto, composta por funcionários do candidato e entidades externas com qualificações adequadas...

7 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 20:3320:33, 2 March 2023DG Regio talk contribs 80,324 bytes +233 Changed label, description and/or aliases in lv, fr, da, it, ro, sk, cs, fi, hu, es, bg, hr, et, pt, ga, de, sl, nl, sv, el, lt, mt, and other parts

27 October 2022

26 October 2022

21 October 2022

3 July 2022

  • curprev 01:1801:18, 3 July 2022DG Regio talk contribs 77,969 bytes +50,115 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 22:0522:05, 2 December 2021DG Regio talk contribs 16,599 bytes +2,751 Created claim: summary (P836): L’objet du projet est la construction d’un réseau de distribution d’eau avec connexions dans le village de Wapnica — rue Okrągła. L’approvisionnement en eau prévu permettra d’approvisionner en eau les bâtiments résidentiels existants et les zones adjacentes. La mise en œuvre, la comptabilité et l’évaluation du projet relèveront de la responsabilité d’une équipe de mise en œuvre du projet composée du personnel de la requérante et d’organismes ext...
  • curprev 22:0522:05, 2 December 2021DG Regio talk contribs 13,848 bytes +160 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:3719:37, 21 October 2020DG Regio talk contribs 14,127 bytes +152 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:3719:37, 21 October 2020DG Regio talk contribs 13,975 bytes −144 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:3719:37, 21 October 2020DG Regio talk contribs 14,119 bytes +2,596 Created claim: summary (P836): The subject of the project is the construction of a distribution water supply network with connections in the town of Wapnica – ul.Okrągła. The water supply system will enable water supply of existing residential buildings and adjacent areas for housing. The project implementation, accounting and evaluation team will be responsible for the implementation of the project, consisting of employees of the Applicant and external entities with appropri...
  • curprev 19:3719:37, 21 October 2020DG Regio talk contribs 11,523 bytes −2,106 Removed claim: summary (P836): The project consists of the construction of a distribution mains network with the connections in the town of Wipnica, which will be cut. The design of the water pipeline will make it possible to contribute to the water of the existing housing and the adjacent land for housing. The project implementation team consisting of the applicant’s staff and external bodies with appropriate qualifications and experienced in the execution of similar inves...

24 September 2020

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:1410:14, 11 March 2020DG Regio talk contribs 12,355 bytes +2,106 Created claim: summary (P836): The project consists of the construction of a distribution mains network with the connections in the town of Wipnica, which will be cut. The design of the water pipeline will make it possible to contribute to the water of the existing housing and the adjacent land for housing. The project implementation team consisting of the applicant’s staff and external bodies with appropriate qualifications and experienced in the execution of similar investm...

25 February 2020

18 February 2020

31 January 2020

14 January 2020