Revision history of "Reconstruction of 2 water treatment stations in Stepnica commune" (Q137892)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:3018:30, 9 October 2024DG Regio talk contribs 90,980 bytes +9 Changed label, description and/or aliases in pt
  • curprev 18:3018:30, 9 October 2024DG Regio talk contribs 90,971 bytes +23 Set a claim value: summary (P836): O projeto tem por objeto a reconstrução de duas estações de tratamento de águas situadas no município de Stepnica (SUW Miłowo e SUW Łąka). O investimento será executado em parte na fórmula «conceção e construção» (no âmbito da renovação e modernização das instalações de tratamento de água com a conclusão das obras de reparação e construção das instalações de SUW) e a sua conclusão está prevista para março de 2019. O âmbito do projeto relacionado com...

7 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

21 October 2022

27 July 2022

  • curprev 18:3118:31, 27 July 2022DG Regio talk contribs 86,432 bytes +56,004 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 22:0522:05, 2 December 2021DG Regio talk contribs 17,644 bytes +3,275 Created claim: summary (P836): Le projet a pour objet la reconstruction de deux stations d’épuration situées dans la municipalité de Stepnica (SUW Miłowo et SUW Łąka). L’investissement sera réalisé en partie dans la formule «conception et construction» (dans le cadre de la rénovation et de la modernisation des installations technologiques de traitement de l’eau ainsi que de la réalisation des travaux de rénovation et de construction d’installations SUW), et son achèvement est...
  • curprev 22:0522:05, 2 December 2021DG Regio talk contribs 14,369 bytes +146 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:3719:37, 21 October 2020DG Regio talk contribs 14,662 bytes +123 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:3719:37, 21 October 2020DG Regio talk contribs 14,539 bytes −133 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:3719:37, 21 October 2020DG Regio talk contribs 14,672 bytes +2,912 Created claim: summary (P836): The subject of the project is the reconstruction of 2 water treatment stations located in the municipality of Stepnica (SUW Miłowo and SUW Łąka). The investment will be implemented in part in the formula “design and build” (within the scope of renovation and modernisation of water treatment installations with the completion of repair and construction works of SUW facilities) and its completion is scheduled for March 2019. The scope of the projec...
  • curprev 19:3719:37, 21 October 2020DG Regio talk contribs 11,760 bytes −2,413 Removed claim: summary (P836): The project concerns the reconstruction of 2 water treatment plants located in the municipality of Stepnica (SUW Miłowo and SUW Total). The investment will be implemented partly in the “design and demolition” formula (renovation and refurbishment of the water treatment plant, with the maintenance of SUW construction works), and its completion is scheduled for March 2019. the scope of the project related to the placement of potable water tanks...

24 September 2020

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:1410:14, 11 March 2020DG Regio talk contribs 12,883 bytes +2,413 Created claim: summary (P836): The project concerns the reconstruction of 2 water treatment plants located in the municipality of Stepnica (SUW Miłowo and SUW Total). The investment will be implemented partly in the “design and demolition” formula (renovation and refurbishment of the water treatment plant, with the maintenance of SUW construction works), and its completion is scheduled for March 2019. the scope of the project related to the placement of potable water tanks wi...

25 February 2020

18 February 2020

31 January 2020

14 January 2020