Revision history of "Extension of the water treatment station in Borne Sulinowo" (Q137884)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:2606:26, 9 October 2024DG Regio talk contribs 75,362 bytes 0 Changed label, description and/or aliases in pt
  • curprev 06:2606:26, 9 October 2024DG Regio talk contribs 75,362 bytes +35 Set a claim value: summary (P836): O projeto deve incluir a ampliação de uma estação de abastecimento de água no âmbito de: plantação do edifício do pavilhão tecnológico em relação às instalações existentes, soluções técnicas e tecnológicas para o tratamento de águas, instalação de bombas de águas profundas e de compartimentos para poços, instalações de canais de água internos e externos, na área da parcela 89/173, instalações elétricas e ACPA. O efeito final do projeto será melhorar...

20 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

21 October 2022

27 July 2022

  • curprev 18:3118:31, 27 July 2022DG Regio talk contribs 70,307 bytes +44,633 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 22:0522:05, 2 December 2021DG Regio talk contribs 15,662 bytes +2,512 Created claim: summary (P836): Le projet comprend l’extension d’une station d’approvisionnement en eau dans les zones suivantes: la construction du bâtiment de hall technologique en relation avec les installations existantes, les solutions techniques et technologiques pour le traitement de l’eau, l’installation de pompes submersibles et d’enceintes de puits, les installations internes et externes de déchets d’eau, sur le terrain 89/173, les installations électriques et ACPiA....
  • curprev 22:0522:05, 2 December 2021DG Regio talk contribs 13,150 bytes +124 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:3719:37, 21 October 2020DG Regio talk contribs 13,465 bytes +117 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:3719:37, 21 October 2020DG Regio talk contribs 13,348 bytes −134 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:3719:37, 21 October 2020DG Regio talk contribs 13,482 bytes +2,254 Created claim: summary (P836): The project shall include the extension of a water supply station in the scope of: planting of the technological hall building in relation to existing facilities, technical and technological solutions for water treatment, installation of deep-sea pumps and well enclosures, internal and external water-channel installations, within the area of plot 89/173, electrical and ACPA.The final effect of the project will be to improve water quality and ens...
  • curprev 19:3719:37, 21 October 2020DG Regio talk contribs 11,228 bytes −1,758 Removed claim: summary (P836): The project involves the extension of the water supply station to the extent of: the erection of a technology hall building with reference to existing plants, technical solutions and technological treatment of water, the installation of deep water pumps and well casings, internal and external installations of the water — the water — the project will improve the quality of the water and ensure the continuity of its delivery to the inhabitants o...

24 September 2020

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:1410:14, 11 March 2020DG Regio talk contribs 11,703 bytes +1,758 Created claim: summary (P836): The project involves the extension of the water supply station to the extent of: the erection of a technology hall building with reference to existing plants, technical solutions and technological treatment of water, the installation of deep water pumps and well casings, internal and external installations of the water — the water — the project will improve the quality of the water and ensure the continuity of its delivery to the inhabitants of...

25 February 2020

18 February 2020

31 January 2020

14 January 2020