Revision history of "Modernisation of rain networks in Świnoujście – stage 1" (Q137847)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 04:1804:18, 11 October 2024DG Regio talk contribs 86,039 bytes −1 Changed label, description and/or aliases in pt
  • curprev 04:1804:18, 11 October 2024DG Regio talk contribs 86,040 bytes +30 Set a claim value: summary (P836): O projeto Mon. «Modernização das redes pluviais em Świnoujście – fase 1» é um projeto fixo e é composto por dois elementos. 1. Modernização das redes pluviais nas chamadas «redes pluviais». O bairro Midtown. O distrito é a 3a Rua da Constituição e o fragm da cidade entre a rua. Piastowska and Pig (em inglês). Para esta tarefa, o beneficiário desenvolveu um conceito. A drenagem de águas pluviais nesta parte da cidade baseia-se em canais de 0,60 m e O...

7 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:1122:11, 2 March 2023DG Regio talk contribs 82,836 bytes −589 Changed label, description and/or aliases in it, da, sk, sv, lv, fi, cs, sl, hu, ro, fr, de, pt, lt, hr, nl, ga, bg, et, el, mt, es, and other parts

27 October 2022

26 October 2022

21 October 2022

3 July 2022

  • curprev 01:1401:14, 3 July 2022DG Regio talk contribs 81,309 bytes +52,392 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 22:0622:06, 2 December 2021DG Regio talk contribs 16,959 bytes +2,990 Created claim: summary (P836): Projet intitulé «Modernisation des réseaux pluviaux dans la ville de Świnoujście — étape 1» est un projet stationnaire et se compose de 2 éléments. 1. Modernisation des réseaux pluviaux dans le soi-disant. Quartier du centre-ville. Ce quartier est la rue de la Constitution 3 Maja et la fragm. de la ville entre ul. Le Piast et le Cochon. Pour cette tâche, le bénéficiaire dispose d’un concept développé. Le système d’eau de pluie dans cette partie...
  • curprev 22:0522:05, 2 December 2021DG Regio talk contribs 13,969 bytes +138 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:3019:30, 21 October 2020DG Regio talk contribs 14,270 bytes +118 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:3019:30, 21 October 2020DG Regio talk contribs 14,152 bytes −148 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:3019:30, 21 October 2020DG Regio talk contribs 14,300 bytes +2,654 Created claim: summary (P836): Project Mon. “Modernisation of rain networks in Świnoujście – stage 1” is a fixed project and consists of 2 elements. 1. Modernisation of rain networks in so-called. The Midtown District. The district is the 3rd Constitution Street and the town’s fragm between the street. Piastowska and Pig. For this task, the beneficiary has developed a concept. Rainwater drainage in this part of the city is based on canals of 0.60 m and O 0.65 m in street. Con...
  • curprev 19:3019:30, 21 October 2020DG Regio talk contribs 11,646 bytes −2,237 Removed claim: summary (P836): The project entitled: “The modernisation of the rainwater system in the area of the city of Świnoujście — step 1” is a stationary project and consists of 2 elements. 1. Modernisation of rainwater systems in so called Urban district. This district is the street of the Constitution on 3 May and a fragment of the city between ul. Piastowska and Sculpins. The beneficiary has a concept for this task. Rain sewers in this part of the city are based o...

24 September 2020

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:1410:14, 11 March 2020DG Regio talk contribs 12,601 bytes +2,237 Created claim: summary (P836): The project entitled: “The modernisation of the rainwater system in the area of the city of Świnoujście — step 1” is a stationary project and consists of 2 elements. 1. Modernisation of rainwater systems in so called Urban district. This district is the street of the Constitution on 3 May and a fragment of the city between ul. Piastowska and Sculpins. The beneficiary has a concept for this task. Rain sewers in this part of the city are based on...

25 February 2020

18 February 2020

31 January 2020

14 January 2020