Revision history of "Reconstruction of the rainwater drainage network ul. 3 – go Marca and St. Kosciuszko in Świdwin" (Q137845)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:5015:50, 7 October 2024DG Regio talk contribs 92,130 bytes −1 Changed label, description and/or aliases in pt
  • curprev 15:5015:50, 7 October 2024DG Regio talk contribs 92,131 bytes −86 Set a claim value: summary (P836): O projecto incidirá na reconstrução da rede de drenagem de águas pluviais ul. 3 de março e St. Kosciuszko em Świdwin, que atualmente se encontra em muito mau estado técnico. O âmbito material do investimento inclui trabalhos preparatórios, que consistem na elaboração de documentação técnica, na obtenção de decisões sobre as condições ambientais de aprovação da execução do investimento, na obtenção de licenças de construção e na elaboração de um estu...

7 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 20:3320:33, 2 March 2023DG Regio talk contribs 89,043 bytes +630 Changed label, description and/or aliases in lv, it, da, sk, ro, sv, fr, fi, sl, hr, ga, et, de, lt, hu, bg, pt, nl, es, mt, el, cs, and other parts

27 October 2022

26 October 2022

21 October 2022

27 July 2022

  • curprev 18:3118:31, 27 July 2022DG Regio talk contribs 86,289 bytes +55,887 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 22:0522:05, 2 December 2021DG Regio talk contribs 17,593 bytes +3,207 Created claim: summary (P836): Le projet concernera la reconstruction du réseau d’assainissement des eaux pluviales. 3 mars et st. Kosciuszko à Świdwin, qui est actuellement dans un très mauvais état technique. Le champ d’application matériel de l’investissement comprend les travaux préparatoires, qui comprennent l’élaboration de la documentation technique, l’obtention d’une décision sur les conditions environnementales pour la réalisation de l’investissement, l’obtention de...
  • curprev 22:0522:05, 2 December 2021DG Regio talk contribs 14,386 bytes +175 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:3019:30, 21 October 2020DG Regio talk contribs 14,650 bytes +157 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:3019:30, 21 October 2020DG Regio talk contribs 14,493 bytes −158 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:3019:30, 21 October 2020DG Regio talk contribs 14,651 bytes +2,813 Created claim: summary (P836): The project will concern the reconstruction of the rainwater drainage network ul. 3 March and St. Kosciuszko in Świdwin, which is currently in a very poor technical condition. The material scope of the investment includes preparatory work, which consists of drawing up technical documentation, obtaining decisions on the environmental conditions of consent to the implementation of the investment, obtaining construction permits and drawing up a fea...
  • curprev 19:3019:30, 21 October 2020DG Regio talk contribs 11,838 bytes −2,352 Removed claim: summary (P836): The project will be aimed at converting the storm water collection network to ul. 3 March and ul. Kościuszki in Świdwin, which is currently in very poor technical condition. The scope of the investment includes preparatory work, which consists of drawing up technical documentation, obtaining a decision on the environmental conditions attached to consent to the implementation of the investment, obtaining building permits and drawing up a feasib...

24 September 2020

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:1410:14, 11 March 2020DG Regio talk contribs 12,905 bytes +2,352 Created claim: summary (P836): The project will be aimed at converting the storm water collection network to ul. 3 March and ul. Kościuszki in Świdwin, which is currently in very poor technical condition. The scope of the investment includes preparatory work, which consists of drawing up technical documentation, obtaining a decision on the environmental conditions attached to consent to the implementation of the investment, obtaining building permits and drawing up a feasibil...

25 February 2020

18 February 2020

31 January 2020

14 January 2020