Revision history of "Construction of a rainwater drainage network in the Myślibórz Municipality" (Q137844)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 04:1804:18, 11 October 2024DG Regio talk contribs 86,270 bytes +14 Changed label, description and/or aliases in pt
  • curprev 04:1804:18, 11 October 2024DG Regio talk contribs 86,256 bytes −30 Set a claim value: summary (P836): O projeto abrange as seguintes tarefas e despesas: Tarefa 1: Trabalhos preparatórios – incluindo: desenvolvimento de um estudo de viabilidade e de um programa funcional e utilizado. Tarefa 2. Construção da secção 1 da rede de esgotos de Myśliborz – incluindo terraplenagem e redes de esgotos nas instalações: dz. N.o: 32, 33/5, 35, 110, 112, 116, 136, 144, 146 Myślibórz 2. Descrição: Projecto e execução de drenagem de águas pluviais para o rio mysla D...

22 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

21 October 2022

3 July 2022

  • curprev 01:1401:14, 3 July 2022DG Regio talk contribs 81,323 bytes +52,262 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 22:0522:05, 2 December 2021DG Regio talk contribs 17,074 bytes +3,030 Created claim: summary (P836): Le projet couvre les tâches et dépenses suivantes: Activité 1: Travaux préparatoires — y compris: élaboration de l’étude de faisabilité et du programme fonctionnel et d’utilité publique. Tâche 2. Construction de la section 1 du réseau d’assainissement des eaux pluviales à Myśliborz — y compris les travaux de terrassement et le réseau d’assainissement dans les zones suivantes: D. No: 32, 33/5, 35, 110, 112, 116, 136, 144, 146 Myślibórz 2. Descrip...
  • curprev 22:0522:05, 2 December 2021DG Regio talk contribs 14,044 bytes +142 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:3019:30, 21 October 2020DG Regio talk contribs 14,341 bytes +135 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:3019:30, 21 October 2020DG Regio talk contribs 14,206 bytes −143 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:3019:30, 21 October 2020DG Regio talk contribs 14,349 bytes +2,638 Created claim: summary (P836): The project shall cover the following tasks and expenditure: Task 1: Preparatory work – including: development of Feasibility Study and Functional and Used Programme. Task 2. Construction of section 1 of the Rain Sewerage in Myśliborz – including earthworks and sewage networks on the premises: dz. No: 32, 33/5, 35, 110, 112, 116, 136, 144, 146 Myślibórz 2. Description: Design and execution of rainwater drainage to the river mysla Dz. No. 32. The...
  • curprev 19:3019:30, 21 October 2020DG Regio talk contribs 11,711 bytes −2,253 Removed claim: summary (P836): The project shall comprise the following tasks and expenses: Task No 1: Preparatory work — including: development of a feasibility study and a functioning utility programme. Task 2. Construction of section No 1 of the storm water collection system in Myślisborzu — covering the earth works and the sewerage system on the site: Dz. 32, 33/5, 35, 110, 112, 116, 136, 144, 146, Myślisbórz 2. Description: The design and construction of rainwater drai...

25 September 2020

24 September 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:1410:14, 11 March 2020DG Regio talk contribs 12,681 bytes +2,253 Created claim: summary (P836): The project shall comprise the following tasks and expenses: Task No 1: Preparatory work — including: development of a feasibility study and a functioning utility programme. Task 2. Construction of section No 1 of the storm water collection system in Myślisborzu — covering the earth works and the sewerage system on the site: Dz. 32, 33/5, 35, 110, 112, 116, 136, 144, 146, Myślisbórz 2. Description: The design and construction of rainwater draina...

25 February 2020

18 February 2020

31 January 2020

14 January 2020