Revision history of "Increasing the use of renewable energy sources through the construction of an installation and a photovoltaic farm in Sławobor" (Q137828)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 05:4805:48, 10 October 2024DG Regio talk contribs 70,498 bytes +50 Set a claim value: summary (P836): O projeto proposto será realizado em Sławobor, distrito de Sławobor, na voivodia da Pomerânia Ocidental. O objeto do projeto será a construção de uma exploração fotovoltaica que produza eletricidade para venda. A exploração situar-se-á na parcela 274 e a instalação da exploração será ligada à linha elétrica existente. O projeto também construirá uma instalação fotovoltaica para a produção de eletricidade, que será instalada no lote 307/3. A energia...

22 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 20:3320:33, 2 March 2023DG Regio talk contribs 67,274 bytes −151 Changed label, description and/or aliases in sk, lv, it, da, cs, pt, et, fr, ga, sv, fi, lt, ro, sl, hr, el, hu, de, mt, nl, es, bg, and other parts

27 October 2022

26 October 2022

21 October 2022

3 July 2022

  • curprev 01:1301:13, 3 July 2022DG Regio talk contribs 65,299 bytes +41,287 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 22:0522:05, 2 December 2021DG Regio talk contribs 15,031 bytes +2,125 Created claim: summary (P836): Le projet proposé sera mis en œuvre à Sławobora, dans le comté de Świidwiński, dans la voïvodie de Poméranie occidentale. Le projet se concentrera sur la construction d’une ferme photovoltaïque produisant de l’électricité à vendre. La ferme sera située sur la placette 274, et l’installation de la ferme sera reliée à la ligne électrique existante. Le projet permettra également de construire une installation photovoltaïque pour la production d’éle...
  • curprev 22:0522:05, 2 December 2021DG Regio talk contribs 12,906 bytes +213 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:3019:30, 21 October 2020DG Regio talk contribs 13,132 bytes +187 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:3019:30, 21 October 2020DG Regio talk contribs 12,945 bytes −173 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:3019:30, 21 October 2020DG Regio talk contribs 13,118 bytes +1,984 Created claim: summary (P836): The proposed project will be carried out in Sławobor, Sławobor County, in the West Pomeranian Voivodeship. The subject of the project will be the construction of a photovoltaic farm producing electricity for sale. The farm will be located on plot 274, and the installation of the farm will be connected to the existing power line. The project will also build a photovoltaic installation for the production of electricity, which will be installed on...
  • curprev 19:3019:30, 21 October 2020DG Regio talk contribs 11,134 bytes −1,494 Removed claim: summary (P836): The proposed project will be carried out in the village of Sławobora, in the district of pigs, in the Zachodniopomorskie region. The project will project the construction of a photovoltaic farm that produces electricity for sale. The farm will be located on plot 274 and the installation will be connected to an existing power line. The project will also build a photovoltaic installation for the production of electricity which will be mounted on...

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:1410:14, 11 March 2020DG Regio talk contribs 11,337 bytes +1,494 Created claim: summary (P836): The proposed project will be carried out in the village of Sławobora, in the district of pigs, in the Zachodniopomorskie region. The project will project the construction of a photovoltaic farm that produces electricity for sale. The farm will be located on plot 274 and the installation will be connected to an existing power line. The project will also build a photovoltaic installation for the production of electricity which will be mounted on p...

25 February 2020

18 February 2020

31 January 2020

14 January 2020