Revision history of "Installation of 742 kWp photovoltaic installations for the Housing Cooperative Lokators-owned Slavs in Świnoujście" (Q137824)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 05:4805:48, 10 October 2024DG Regio talk contribs 61,581 bytes −36 Changed label, description and/or aliases in pt
  • curprev 05:4805:48, 10 October 2024DG Regio talk contribs 61,617 bytes −22 Set a claim value: summary (P836): O projeto tem por objeto a construção de instalações fotovoltaicas com uma capacidade total instalada de 742 kW, constituídas por 2968 painéis fotovoltaicos com uma área total de 4897,2 m2, que serão instalados em 41 edifícios pertencentes à Recorrente. A instalação prevista será ligada à rede elétrica existente. A eletricidade será utilizada única e exclusivamente para cobrir a procura de energia das partes comuns (administrativas) do edifício, ou...

20 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 16:3716:37, 2 March 2023DG Regio talk contribs 58,465 bytes +899 Changed label, description and/or aliases in ro, lv, it, da, sk, ga, fi, bg, et, hr, sv, de, hu, fr, cs, el, sl, pt, lt, nl, mt, es, and other parts

27 October 2022

26 October 2022

21 October 2022

3 July 2022

  • curprev 01:1301:13, 3 July 2022DG Regio talk contribs 55,453 bytes +34,064 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 22:0522:05, 2 December 2021DG Regio talk contribs 13,908 bytes +1,718 Created claim: summary (P836): Le projet concerne la construction d’installations photovoltaïques d’une puissance installée totale de 742 kW, composées de 2968 panneaux photovoltaïques, d’une superficie totale de 4 897,2 m², à installer sur 41 bâtiments appartenant à la requérante. L’installation prévue sera raccordée au réseau électrique existant. L’électricité sera utilisée uniquement et exclusivement pour couvrir les besoins énergétiques des parties communes (administrativ...
  • curprev 22:0522:05, 2 December 2021DG Regio talk contribs 12,190 bytes +231 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:3019:30, 21 October 2020DG Regio talk contribs 12,398 bytes +176 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:3019:30, 21 October 2020DG Regio talk contribs 12,222 bytes −197 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:3019:30, 21 October 2020DG Regio talk contribs 12,419 bytes +1,622 Created claim: summary (P836): The subject of the project is the construction of photovoltaic installations with a total installed capacity of 742 kW, consisting of 2968 photovoltaic panels covering a total area of 4897.2 m², which will be installed on 41 buildings belonging to the Applicant. The planned installation will be connected to the existing electricity grid. Electricity will be used only and exclusively to cover the energy demand for the common (administrative) part...
  • curprev 19:3019:30, 21 October 2020DG Regio talk contribs 10,797 bytes −1,214 Removed claim: summary (P836): The project concerns the construction of photovoltaic installations with a total installed capacity of 742 kW, consisting of 2968 solar panels, covering a total of 4 897.2 m², which will be installed in 41 buildings belonging to the Applicant. The planned installation will be connected to the existing electricity network. The electricity will be used only and exclusively to cover the energy needs of the common (administrative) parts of the bui...

24 September 2020

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:0410:04, 11 March 2020DG Regio talk contribs 10,728 bytes +1,214 Created claim: summary (P836): The project concerns the construction of photovoltaic installations with a total installed capacity of 742 kW, consisting of 2968 solar panels, covering a total of 4 897.2 m², which will be installed in 41 buildings belonging to the Applicant. The planned installation will be connected to the existing electricity network. The electricity will be used only and exclusively to cover the energy needs of the common (administrative) parts of the build...

25 February 2020

18 February 2020

31 January 2020

14 January 2020