Revision history of "Increase the production of energy from renewable sources, used for the purposes of the Agritourism Centre, Mill over the Old Regament”" (Q137822)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:5015:50, 7 October 2024DG Regio talk contribs 67,126 bytes −14 Changed label, description and/or aliases in pt
  • curprev 15:5015:50, 7 October 2024DG Regio talk contribs 67,140 bytes −60 Set a claim value: summary (P836): O projecto é estacionário e está dividido em três tarefas. Tarefa 1 Comprar e instalar a instalação fotovoltaica. Tarefa n.o 2 Aquisição e instalação de um sistema de bomba geotérmica de 69 MWht para efeitos das instalações turísticas «Młyn» (componentes: bomba de calor externa, unidade de regulação e ligação completa, reservatório de 500 L, conjunto da bomba de circulação, sistema de comunicação, reservatório de água quente 500 L, conjunto da bomba...

23 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 20:2820:28, 2 March 2023DG Regio talk contribs 64,026 bytes +1,180 Changed label, description and/or aliases in lv, da, sk, it, cs, et, fr, hu, el, ga, ro, fi, bg, pt, lt, sv, nl, hr, mt, es, sl, de, and other parts

27 October 2022

26 October 2022

21 October 2022

3 July 2022

  • curprev 01:1301:13, 3 July 2022DG Regio talk contribs 60,725 bytes +38,098 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 22:0722:07, 2 December 2021DG Regio talk contribs 14,437 bytes +1,973 Created claim: summary (P836): Le projet est stationnaire et est divisé en trois tâches. Activité 1 Achat et installation d’une installation photovoltaïque. Tâche no 2 Achat et installation d’un système de pompes géothermiques de 69 MWht pour les locaux touristiques «Młyn» (parties: chaleur externe, unité de réglage et de raccordement complet, réservoir tampon 500 L, assemblage de pompes circulantes, système de communication, réservoir de stockage d’eau chaude 500 L, assembla...
  • curprev 22:0722:07, 2 December 2021DG Regio talk contribs 12,464 bytes +198 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:3019:30, 21 October 2020DG Regio talk contribs 12,705 bytes +196 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:3019:30, 21 October 2020DG Regio talk contribs 12,509 bytes −164 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:3019:30, 21 October 2020DG Regio talk contribs 12,673 bytes +1,773 Created claim: summary (P836): The project is stationary and is divided into three tasks. Task 1 Purchase and install photovoltaic installation. Task No. 2 Purchase and installation of a 69 MWht geothermal pump system for the purpose of the “Młyn” tourist premises (components: external heat pump, complete adjustment and connection unit, 500 L buffer tank, circulating pump assembly, communication system, hot water storage tank 500 L, circulating pump assembly, control system,...
  • curprev 19:3019:30, 21 October 2020DG Regio talk contribs 10,900 bytes −1,437 Removed claim: summary (P836): The project is of a stationary nature and is divided into three tasks. Task No 1 Purchase and installation of a photovoltaic installation. Task No 2 Purchase and installation of a geothermal pump system with a capacity of 69 MWHT for the tourist accommodation ‘Młyn’ (outdoor part składowe:pompa heat, complete adjustment and connection assembly, buffer strip 500 L, circulating pump assembly, communication system, hot water storage tank 500 L, a...

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:0410:04, 11 March 2020DG Regio talk contribs 11,043 bytes +1,437 Created claim: summary (P836): The project is of a stationary nature and is divided into three tasks. Task No 1 Purchase and installation of a photovoltaic installation. Task No 2 Purchase and installation of a geothermal pump system with a capacity of 69 MWHT for the tourist accommodation ‘Młyn’ (outdoor part składowe:pompa heat, complete adjustment and connection assembly, buffer strip 500 L, circulating pump assembly, communication system, hot water storage tank 500 L, ass...

25 February 2020

18 February 2020

31 January 2020

14 January 2020