Revision history of "Construction of a photovoltaic installation enabling the use of renewable energy sources by Print Group Sp. z o.o. in Szczecin – building I" (Q137821)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 05:4705:47, 10 October 2024DG Regio talk contribs 93,378 bytes 0 Changed label, description and/or aliases in pt
  • curprev 05:4705:47, 10 October 2024DG Regio talk contribs 93,378 bytes −52 Set a claim value: summary (P836): O principal objetivo do projeto é a produção de eletricidade a partir de fontes renováveis de natureza, através de uma instalação fotovoltaica, juntamente com as infraestruturas necessárias. Toda a energia produzida será afetada às atividades estatutárias da recorrente. A instalação fotovoltaica (combinada com 360 unidades de painéis fotovoltaicos com uma capacidade unitária de 260 W) estará localizada no edifício recém-criado pertencente à recorren...

22 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

21 October 2022

27 July 2022

  • curprev 18:3018:30, 27 July 2022DG Regio talk contribs 88,078 bytes +57,394 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 22:0722:07, 2 December 2021DG Regio talk contribs 17,755 bytes +3,101 Created claim: summary (P836): L’objectif principal du projet est de produire de l’électricité à partir de sources renouvelables, au moyen d’une installation photovoltaïque dotée des infrastructures nécessaires. Toute l’énergie produite sera affectée aux activités statutaires du demandeur. L’installation photovoltaïque (composée de 360 unités de panneaux photovoltaïques d’une puissance unitaire de 260 W) sera située sur un bâtiment nouvellement créé appartenant à la requérant...
  • curprev 22:0722:07, 2 December 2021DG Regio talk contribs 14,654 bytes +229 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:3019:30, 21 October 2020DG Regio talk contribs 14,864 bytes +201 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:3019:30, 21 October 2020DG Regio talk contribs 14,663 bytes −208 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:3019:30, 21 October 2020DG Regio talk contribs 14,871 bytes +2,903 Created claim: summary (P836): The main objective of the project is the production of electricity from renewable sources of nature, by means of a photovoltaic installation together with the necessary infrastructure. All the energy produced will be allocated to the applicant’s statutory activities. The photovoltaic installation (combined of 360 units of photovoltaic panels with a unit capacity of 260 W) will be located on the newly created building belonging to the applicant....
  • curprev 19:3019:30, 21 October 2020DG Regio talk contribs 11,968 bytes −2,516 Removed claim: summary (P836): The main objective of the project is to produce electricity from renewable sources by means of a photovoltaic installation with the necessary infrastructure. The entire energy produced will be allocated to the applicant’s statutory activities. A photovoltaic installation (consisting of 360 solar panels with a unit capacity of 260W) will be located on the newly created building belonging to the applicant. The project is divided into Phase II (a...

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:0410:04, 11 March 2020DG Regio talk contribs 13,191 bytes +2,516 Created claim: summary (P836): The main objective of the project is to produce electricity from renewable sources by means of a photovoltaic installation with the necessary infrastructure. The entire energy produced will be allocated to the applicant’s statutory activities. A photovoltaic installation (consisting of 360 solar panels with a unit capacity of 260W) will be located on the newly created building belonging to the applicant. The project is divided into Phase II (a p...

25 February 2020

18 February 2020

31 January 2020

14 January 2020