Revision history of "“Construction of photovoltaic installation and hybrid module for the purpose of powering Koszalin Water Park”" (Q137820)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:4618:46, 8 October 2024DG Regio talk contribs 77,177 bytes −17 Changed label, description and/or aliases in pt
  • curprev 18:4618:46, 8 October 2024DG Regio talk contribs 77,194 bytes +64 Set a claim value: summary (P836): O projeto consiste em: 1) a construção de uma instalação fotovoltaica na estrutura de apoio na zona verde do Parque Aquático de Koszalin com uma potência de 399,6 kW, juntamente com os elementos necessários para o funcionamento da instalação e a estrutura de apoio para os painéis, 2) a montagem de três painéis híbridos de produção de eletricidade e calor em cogeração com uma potência térmica de 2,685 kW e uma potência elétrica de 0,9 kW. O projecto...

23 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 20:3320:33, 2 March 2023DG Regio talk contribs 73,956 bytes −426 Changed label, description and/or aliases in sk, da, it, sv, el, fi, et, cs, ga, fr, bg, lv, hu, ro, pt, lt, hr, de, es, mt, nl, sl, and other parts

27 October 2022

26 October 2022

21 October 2022

27 July 2022

  • curprev 18:3018:30, 27 July 2022DG Regio talk contribs 72,275 bytes +45,730 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 22:0722:07, 2 December 2021DG Regio talk contribs 15,972 bytes +2,598 Created claim: summary (P836): Le projet consiste en: 1) la construction d’une installation photovoltaïque sur une structure de soutènement dans une zone verte près du parc aquatique de Koszalin d’une puissance de 399,6 kW avec des éléments nécessaires au fonctionnement de l’installation et avec une structure de support pour panneaux, 2) l’installation de trois panneaux hybrides produisant de l’électricité et de la chaleur en cogénération d’une puissance thermique de 2,685 kW...
  • curprev 22:0722:07, 2 December 2021DG Regio talk contribs 13,374 bytes +183 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:3019:30, 21 October 2020DG Regio talk contribs 13,630 bytes +173 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:3019:30, 21 October 2020DG Regio talk contribs 13,457 bytes −157 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:3019:30, 21 October 2020DG Regio talk contribs 13,614 bytes +2,296 Created claim: summary (P836): The project consists of: 1) the construction of a photovoltaic installation on the support structure in the green area at the Water Park in Koszalin with a power of 399,6 kW, together with the elements necessary for the operation of the installation and the supporting structure for the panels, 2) assembling three hybrid panels producing electricity and heat in cogeneration with thermal power of 2.685 kW and electric power 0,9 kW. The project is...
  • curprev 19:3019:30, 21 October 2020DG Regio talk contribs 11,318 bytes −1,849 Removed claim: summary (P836): The project consists of: 1) the construction of a support installation for the support structure on the green site at Koszalin Park, in Koszalin, with a power of 399.6 kW with the elements necessary for the operation of the installation and with the structure supporting the panels, (2) the installation of three hybrid panels producing electricity and heating in cogeneration with a thermal power of 2.685 kW and a power of 0.9 kW. The project is...

24 September 2020

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:0410:04, 11 March 2020DG Regio talk contribs 11,872 bytes +1,849 Created claim: summary (P836): The project consists of: 1) the construction of a support installation for the support structure on the green site at Koszalin Park, in Koszalin, with a power of 399.6 kW with the elements necessary for the operation of the installation and with the structure supporting the panels, (2) the installation of three hybrid panels producing electricity and heating in cogeneration with a thermal power of 2.685 kW and a power of 0.9 kW. The project is s...

25 February 2020

18 February 2020

31 January 2020

14 January 2020