Revision history of "PV system for “Spot” PSS in Sławow" (Q137815)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 16:3916:39, 10 October 2024DG Regio talk contribs 74,291 bytes −3 Changed label, description and/or aliases in pt
  • curprev 16:3916:39, 10 October 2024DG Regio talk contribs 74,294 bytes +51 Set a claim value: summary (P836): O projeto tem por objeto a preparação e execução abrangentes de investimentos em fontes de energia renováveis no «Spol» do PSS em Sławow, sob a forma de um sistema fotovoltaico, juntamente com atividades de acompanhamento. O projeto inclui a aquisição, entrega, montagem e entrada em funcionamento de quatro instalações fotovoltaicas supervisionadas (separadas), com uma capacidade total instalada de 86,92 kWp. O investimento é realizado em quatro loca...

22 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 20:3320:33, 2 March 2023DG Regio talk contribs 71,070 bytes −604 Changed label, description and/or aliases in lv, it, fr, bg, da, sv, sk, ro, cs, fi, et, pt, de, es, el, mt, hr, nl, ga, lt, sl, hu, and other parts

27 October 2022

26 October 2022

21 October 2022

3 July 2022

  • curprev 01:1201:12, 3 July 2022DG Regio talk contribs 69,548 bytes +44,535 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 22:0722:07, 2 December 2021DG Regio talk contribs 15,469 bytes +2,426 Created claim: summary (P836): Le projet a pour objet la préparation et la mise en œuvre complètes d’investissements dans les sources d’énergie renouvelables dans le SSS «Społ» à Sławno, sous la forme d’un système photovoltaïque accompagné d’activités d’accompagnement. Le projet comprend l’achat, la fourniture, l’assemblage et la mise en service de quatre installations photovoltaïques aériennes (séparées) d’une puissance installée totale de 86,92 kWc. L’investissement est réa...
  • curprev 22:0722:07, 2 December 2021DG Regio talk contribs 13,043 bytes +102 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:3019:30, 21 October 2020DG Regio talk contribs 13,380 bytes +98 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:3019:30, 21 October 2020DG Regio talk contribs 13,282 bytes −100 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:3019:30, 21 October 2020DG Regio talk contribs 13,382 bytes +2,252 Created claim: summary (P836): The subject of the project is the comprehensive preparation and implementation of investments in renewable energy sources in the “Spol” of PSS in Sławow in the form of a PV system together with accompanying activities. The project includes the purchase, delivery, assembly and commissioning of four (separate) supervised photovoltaic installations with a total installed capacity of 86.92 kWp. The investment is carried out in four locations in Sław...
  • curprev 19:3019:30, 21 October 2020DG Regio talk contribs 11,130 bytes −1,768 Removed claim: summary (P836): The project consists of a comprehensive preparation and implementation of the investment in renewable energy sources in the ‘Spot’ of the PSS in Sławno, in the form of a PV system with accompanying actions. The project consists of the purchase, supply, installation and launch of four (separate) solar photovoltaic (separate) solar PV installations with a total installed capacity of 86,92 kWp. Investment carried out in four locations in Sławat:...

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:0410:04, 11 March 2020DG Regio talk contribs 11,615 bytes +1,768 Created claim: summary (P836): The project consists of a comprehensive preparation and implementation of the investment in renewable energy sources in the ‘Spot’ of the PSS in Sławno, in the form of a PV system with accompanying actions. The project consists of the purchase, supply, installation and launch of four (separate) solar photovoltaic (separate) solar PV installations with a total installed capacity of 86,92 kWp. Investment carried out in four locations in Sławat: Pl...

25 February 2020

18 February 2020

31 January 2020

14 January 2020