Revision history of "“Construction of photovoltaic installation in Dźwirzyn at 15 Jachtowa Street”" (Q137809)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 05:4705:47, 10 October 2024DG Regio talk contribs 91,338 bytes +6 Changed label, description and/or aliases in pt
  • curprev 05:4705:47, 10 October 2024DG Regio talk contribs 91,332 bytes −71 Set a claim value: summary (P836): O objeto do projeto é a construção de duas instalações fotovoltaicas, que serão geradores a partir de energias renováveis. As instalações em causa terão poderes para: Instalação PV 1: 49,91 kWp Instalação PV 2: 49,91 kWp As instalações produzirão eletricidade inteiramente para fins próprios, estabelecendo um bloqueio do fluxo de eletricidade para a rede elétrica pública, com a possibilidade de libertar eletricidade excedentária para a rede elétrica...

23 March 2024

13 December 2023

6 July 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 20:3320:33, 2 March 2023DG Regio talk contribs 88,951 bytes +805 Changed label, description and/or aliases in fr, lv, it, sv, da, ro, de, cs, sk, fi, hr, es, bg, el, mt, et, sl, lt, hu, nl, pt, ga, and other parts

27 October 2022

26 October 2022

21 October 2022

27 July 2022

  • curprev 18:3018:30, 27 July 2022DG Regio talk contribs 86,071 bytes +56,025 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 22:0722:07, 2 December 2021DG Regio talk contribs 17,538 bytes +3,197 Created claim: summary (P836): L’objet du projet est la construction de deux installations photovoltaïques, qui constitueront des groupes de production utilisant des énergies renouvelables. Les installations en question auront la capacité: Installation du PV 1: 49,91 kWp Installation PV 2: 49,91 kWp Les installations produiront entièrement de l’électricité pour leur propre usage en établissant un blocage des sorties d’électricité vers le réseau public d’électricité avec la po...
  • curprev 22:0722:07, 2 December 2021DG Regio talk contribs 14,341 bytes +145 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:2919:29, 21 October 2020DG Regio talk contribs 14,635 bytes +141 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:2919:29, 21 October 2020DG Regio talk contribs 14,494 bytes −152 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:2919:29, 21 October 2020DG Regio talk contribs 14,646 bytes +2,888 Created claim: summary (P836): The subject of the project is the construction of two photovoltaic installations, which will be generating sets using renewable energy. The installations concerned will have the power to: Installation PV 1: 49,91 kWp Installation PV 2: 49.91 kWp Installations will generate electricity entirely for own purposes by establishing a blockade of electricity outflow to the public electricity grid with the possibility of releasing surplus electricity in...
  • curprev 19:2919:29, 21 October 2020DG Regio talk contribs 11,758 bytes −2,465 Removed claim: summary (P836): The project involves the construction of two photovoltaic installations which will constitute generating sets with renewable energy. The installations in question will have the following power: Installation of PV 1: 49,91 kWp installation PV 2: 49,91 kWp will generate electricity for their own account by the assumption of blocking the flow of electricity to the public electricity grid with the possibility to donate surplus electricity to the p...

24 September 2020

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:0410:04, 11 March 2020DG Regio talk contribs 12,935 bytes +2,465 Created claim: summary (P836): The project involves the construction of two photovoltaic installations which will constitute generating sets with renewable energy. The installations in question will have the following power: Installation of PV 1: 49,91 kWp installation PV 2: 49,91 kWp will generate electricity for their own account by the assumption of blocking the flow of electricity to the public electricity grid with the possibility to donate surplus electricity to the pub...

25 February 2020

18 February 2020

31 January 2020

14 January 2020