Revision history of "Construction of a photovoltaic installation supplying the Sports and spectacle hall in Płoty" (Q137801)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:4618:46, 8 October 2024DG Regio talk contribs 92,906 bytes +9 Changed label, description and/or aliases in pt
  • curprev 18:4618:46, 8 October 2024DG Regio talk contribs 92,897 bytes +27 Set a claim value: summary (P836): O projecto é estacionário. Localização do projecto: Cercas, colmeias. Koszalińska 2a, parcela n.o 47, área geodésica 2 m. Płoty. O projeto será implementado na área de Intervenção Estratégica (SSW). O projeto tem por objeto a construção de uma instalação fotovoltaica com uma potência de aproximadamente 39,52 Wp – 137 células fotovoltaicas com uma potência de, pelo menos, 290 Wp cada. A eletricidade sob a forma de corrente contínua através de células...

7 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 18:5818:58, 2 March 2023DG Regio talk contribs 89,696 bytes +762 Changed label, description and/or aliases in da, it, sk, cs, fi, de, lv, et, sv, el, pt, bg, ga, hr, nl, ro, hu, fr, es, lt, mt, sl, and other parts

27 October 2022

26 October 2022

21 October 2022

3 July 2022

  • curprev 01:1201:12, 3 July 2022DG Regio talk contribs 86,813 bytes +56,312 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 22:0622:06, 2 December 2021DG Regio talk contribs 17,666 bytes +3,191 Created claim: summary (P836): Le projet est stationnaire. Localisation du projet: Des clôtures, St. Koszalińska 2a, parcelle no 47, zone d’arpentage à 2 m. Płoty. Le projet sera mis en œuvre dans le domaine d’intervention stratégique (SSW). L’objet du projet est la construction d’une installation photovoltaïque d’une capacité d’env. 39,52 Wp — 137 cellules photovoltaïques d’une puissance d’au moins 290 Wp chacune. L’électricité sous forme de courant continu produite par des...
  • curprev 22:0622:06, 2 December 2021DG Regio talk contribs 14,475 bytes +165 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:2219:22, 21 October 2020DG Regio talk contribs 14,749 bytes +152 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:2219:22, 21 October 2020DG Regio talk contribs 14,597 bytes −121 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:2219:22, 21 October 2020DG Regio talk contribs 14,718 bytes +2,939 Created claim: summary (P836): The project is stationary. Location of the project: Fences, hives. Koszalińska 2a, plot no. 47, geodetic area 2 m. Płoty. The project will be implemented in the area of Strategic Intervention (SSW). The object of the project is the construction of a photovoltaic installation with a power of approx. 39.52 Wp – 137 photovoltaic cells with a power of at least 290 Wp each. Electricity in the form of direct current through photovolt cells will be con...
  • curprev 19:2219:22, 21 October 2020DG Regio talk contribs 11,779 bytes −2,439 Removed claim: summary (P836): The project is stationary. Location of the project: Fences, ul. Koszalin 2a plot No. 47, geodesic zone 2 m. The project will be implemented in the Strategic Intervention Area (SSW). The object of the project is the construction of a photovoltaic power plant of ca. 39,52 Wp — 137 photovoltaics power of at least 290 Wp each. The electricity in the form of DC power plants will be passed by the wave cells to 400V alternating current and then via a...

24 September 2020

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:0410:04, 11 March 2020DG Regio talk contribs 12,940 bytes +2,439 Created claim: summary (P836): The project is stationary. Location of the project: Fences, ul. Koszalin 2a plot No. 47, geodesic zone 2 m. The project will be implemented in the Strategic Intervention Area (SSW). The object of the project is the construction of a photovoltaic power plant of ca. 39,52 Wp — 137 photovoltaics power of at least 290 Wp each. The electricity in the form of DC power plants will be passed by the wave cells to 400V alternating current and then via a t...

25 February 2020

18 February 2020

31 January 2020

14 January 2020