Revision history of "Increase the use of renewable sources for “Budder incineration” – Weles Sp z o.o. Komandytowa Company" (Q137798)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 16:3916:39, 10 October 2024DG Regio talk contribs 77,959 bytes −4 Changed label, description and/or aliases in pt
  • curprev 16:3916:39, 10 October 2024DG Regio talk contribs 77,963 bytes +13 Set a claim value: summary (P836): Este projeto consiste no fornecimento e instalação de uma instalação fotovoltaica completa no telhado de um edifício com uma potência de 39,90 kW com uma ligação à rede. A instalação fotovoltaica será composta por 145 unidades de módulos policristalinos com uma capacidade de 275 W-DC cada, colocados na área do telhado da instalação de incineração localizada em Ramlewo, Dz. No 139/6 gm, hospitaleiro. A instalação projetada será feita no sistema ligad...

22 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 20:3320:33, 2 March 2023DG Regio talk contribs 74,776 bytes −544 Changed label, description and/or aliases in lv, it, fr, sv, da, ro, de, cs, sk, hr, fi, es, bg, el, sl, et, hu, pt, lt, mt, nl, ga, and other parts

27 October 2022

26 October 2022

21 October 2022

27 July 2022

  • curprev 18:3018:30, 27 July 2022DG Regio talk contribs 73,195 bytes +46,875 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 22:0622:06, 2 December 2021DG Regio talk contribs 15,970 bytes +2,488 Created claim: summary (P836): Le projet en question consiste en la fourniture et l’installation d’une installation photovoltaïque complète sur le toit du bâtiment d’une capacité de 39,90 kW, ainsi que le raccordement au réseau. L’installation photovoltaïque se composera de 145 modules polycristallins d’une puissance de 275 W-DC chacun, situés sur le toit de l’incinérateur de cadavre situé à Ramlewo dz. no. 139/6 Gm. Maison d’hôtes. L’installation prévue se fera dans le systè...
  • curprev 22:0622:06, 2 December 2021DG Regio talk contribs 13,482 bytes +199 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:2219:22, 21 October 2020DG Regio talk contribs 13,722 bytes +167 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:2219:22, 21 October 2020DG Regio talk contribs 13,555 bytes −170 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:2119:21, 21 October 2020DG Regio talk contribs 13,725 bytes +2,358 Created claim: summary (P836): This project consists of the supply and installation of a complete photovoltaic installation on the roof of a building with a power of 39,90 kW with a connection to the grid. The photovoltaic installation will consist of 145 units of polycrystalline modules with a capacity of 275 W-DC each, placed on the roof area of the incineration plant located in Ramlewo, Dz. No. 139/6 gm, hospitable. The designed installation will be made in the on-grid sys...
  • curprev 19:2119:21, 21 October 2020DG Regio talk contribs 11,367 bytes −1,860 Removed claim: summary (P836): The project consists of the supply and installation of a complete photovoltaic installation on the roof of a building of 39.90 kW with connection to the grid. The installation of a photovoltaic installation will consist of 145 units of polycrystalline modules with a 275W-DC power station, each on top of the incinerator at Ramleft. ewid. 139/6 Gościno Gobcino. The planned installation will be implemented in an on-grid system. The electricity ge...

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:0410:04, 11 March 2020DG Regio talk contribs 11,945 bytes +1,860 Created claim: summary (P836): The project consists of the supply and installation of a complete photovoltaic installation on the roof of a building of 39.90 kW with connection to the grid. The installation of a photovoltaic installation will consist of 145 units of polycrystalline modules with a 275W-DC power station, each on top of the incinerator at Ramleft. ewid. 139/6 Gościno Gobcino. The planned installation will be implemented in an on-grid system. The electricity gene...

25 February 2020

18 February 2020

31 January 2020

14 January 2020