Revision history of "Construction of photovoltaic INSTALACIA for the Beńko Roman W Wierzchowie Production and Commerce Plant" (Q137797)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:3018:30, 9 October 2024DG Regio talk contribs 92,724 bytes +15 Changed label, description and/or aliases in pt
  • curprev 18:3018:30, 9 October 2024DG Regio talk contribs 92,709 bytes +101 Set a claim value: summary (P836): O objeto do projeto é a entrega e instalação de painéis fotovoltaicos com uma potência total instalada de 39,78 kW no telhado do edifício em ul. Parkowa 5, em Wierzchów, com a utilização de energia produzida a 100 % para necessidades próprias – fábrica de produção e comércio de Roman Beńko, em Wierzchów, e ainda ZPH Roman Beńko (as necessidades de eletricidade da central excedem a quantidade de energia que será produzida a partir de painéis). O inve...

7 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 21:3121:31, 2 March 2023DG Regio talk contribs 89,434 bytes −934 Changed label, description and/or aliases in it, da, sk, fr, fi, lv, hr, sv, el, ga, lt, ro, bg, hu, de, et, cs, pt, sl, nl, mt, es, and other parts

27 October 2022

26 October 2022

21 October 2022

27 July 2022

  • curprev 18:3018:30, 27 July 2022DG Regio talk contribs 88,249 bytes +57,313 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 22:0622:06, 2 December 2021DG Regio talk contribs 17,753 bytes +3,200 Created claim: summary (P836): L’objet du projet est la fourniture et l’installation de panneaux photovoltaïques d’une puissance électrique installée totale de 39,78 kW sur le toit du bâtiment à ul. Parkowa 5 à Wierzchów avec l’utilisation de l’énergie produite à 100 % pour usage propre — l’usine de production et commerciale Roman Beńko à Wierzchów, ci-après ZPH Roman Beńko (les besoins de l’installation en électricité dépassent la quantité d’énergie qui sera produite à parti...
  • curprev 22:0622:06, 2 December 2021DG Regio talk contribs 14,553 bytes +169 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:2119:21, 21 October 2020DG Regio talk contribs 14,823 bytes +164 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:2119:21, 21 October 2020DG Regio talk contribs 14,659 bytes −155 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:2119:21, 21 October 2020DG Regio talk contribs 14,814 bytes +2,986 Created claim: summary (P836): The subject of the project is the delivery and installation of photovoltaic panels with a total installed power of 39.78 kW on the roof of the building at ul. Parkowa 5 in Wierzchów with the use of energy produced in 100 % for own needs – Roman Beńko Production and Trade Plant in Wierzchów, further ZPH Roman Beńko (the plant’s electricity needs exceed the amount of energy that will be produced from panels). The investment will be carried out in...
  • curprev 19:2119:21, 21 October 2020DG Regio talk contribs 11,828 bytes −2,504 Removed claim: summary (P836): The project concerns the supply and installation of solar panels with a total installed electricity capacity of 39.78 kW on the roof of the building at ul. Parkowa 5, Wierzchów, with an energy production of 100 % for own use, Roman Beńko (Zakład Produkcyjno-Handlowy), Roman Beńko (Zechów Roman Beńko) (the electrical power plant’s needs exceed the amount of energy that will be produced from the panels). The investment will be carried out in the...

24 September 2020

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:0410:04, 11 March 2020DG Regio talk contribs 13,038 bytes +2,504 Created claim: summary (P836): The project concerns the supply and installation of solar panels with a total installed electricity capacity of 39.78 kW on the roof of the building at ul. Parkowa 5, Wierzchów, with an energy production of 100 % for own use, Roman Beńko (Zakład Produkcyjno-Handlowy), Roman Beńko (Zechów Roman Beńko) (the electrical power plant’s needs exceed the amount of energy that will be produced from the panels). The investment will be carried out in the a...

25 February 2020

18 February 2020

31 January 2020

14 January 2020