Revision history of "Construction of a photovoltaic installation using renewable energy sources by Koschem Ksel-Adamus Sp. j." (Q137793)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 04:1804:18, 11 October 2024DG Regio talk contribs 89,305 bytes 0 Changed label, description and/or aliases in pt
  • curprev 04:1804:18, 11 October 2024DG Regio talk contribs 89,305 bytes −101 Set a claim value: summary (P836): O projecto é estacionário. O projeto tem por objeto a construção de uma instalação fotovoltaica, em conformidade com o artigo 3.o, n.o 3, da Lei de 7 de julho de 1994. A instalação fotovoltaica será uma fonte de energia renovável e será construída a partir de células fotovoltaicas autónomas com inversores. Capacidade total de instalação 0,2 MW. A área ocupada pela estrutura das tabelas sob os módulos – 4600 m2, a área dos módulos fotovoltaicos na pr...

22 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

21 October 2022

3 July 2022

  • curprev 01:1101:11, 3 July 2022DG Regio talk contribs 82,617 bytes +53,415 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 21:5321:53, 2 December 2021DG Regio talk contribs 17,200 bytes +2,971 Created claim: summary (P836): Le projet est stationnaire. Le projet a pour objet la construction d’une installation photovoltaïque, conformément à l’article 3, paragraphe 3, de la loi du 7 juillet 1994. L’installation photovoltaïque sera une source d’énergie renouvelable et sera construite à partir de cellules photovoltaïques autonomes ainsi que d’onduleurs. Capacité totale d’installation 0,2 MW. Superficie occupée par la construction de tables pour modules — 4 600 m², surfa...
  • curprev 21:5321:53, 2 December 2021DG Regio talk contribs 14,229 bytes +189 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:2119:21, 21 October 2020DG Regio talk contribs 14,479 bytes +164 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:2119:21, 21 October 2020DG Regio talk contribs 14,315 bytes −163 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:2119:21, 21 October 2020DG Regio talk contribs 14,478 bytes +2,701 Created claim: summary (P836): The project is stationary. The object of the project is the construction of a photovoltaic installation – in accordance with Article 3 point 3 of the Act of 7 July 1994. The photovoltaic installation will be a renewable energy source and will be built from free-standing photovoltaic cells with inverters. Total installation capacity 0,2 MW. The area occupied by the structure of the tables under the modules – 4600 m², the area of photovoltaic modu...
  • curprev 19:2119:21, 21 October 2020DG Regio talk contribs 11,777 bytes −2,316 Removed claim: summary (P836): The project is stationary. The object of the project is the construction of a photovoltaic installation, in accordance with Article 3 (3) of the Construction Law Act of 7 July 1994, the construction site will be a construction site facility. The photovoltaic installation will be a renewable source of power and will be constructed of standalone PV cells together with inverters. Total installation capacity of 0.2 MW. Surface area of modules — 4 ...

24 September 2020

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:0410:04, 11 March 2020DG Regio talk contribs 12,812 bytes +2,316 Created claim: summary (P836): The project is stationary. The object of the project is the construction of a photovoltaic installation, in accordance with Article 3 (3) of the Construction Law Act of 7 July 1994, the construction site will be a construction site facility. The photovoltaic installation will be a renewable source of power and will be constructed of standalone PV cells together with inverters. Total installation capacity of 0.2 MW. Surface area of modules — 4 60...

25 February 2020

18 February 2020

31 January 2020

14 January 2020