Revision history of "“Construction of 0,4 MW photovoltaic installations on roofs of sorting and composting plants in RZGO in Słajsin”" (Q137790)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:3018:30, 9 October 2024DG Regio talk contribs 75,714 bytes +5 Changed label, description and/or aliases in pt
  • curprev 18:3018:30, 9 October 2024DG Regio talk contribs 75,709 bytes −43 Set a claim value: summary (P836): O investimento previsto é fixo e consistirá na construção de instalações fotovoltaicas nos telhados da estação de triagem e compostagem da Central Regional de Gestão de Resíduos com uma capacidade total de 400 kW, incluindo: — 350 kW no telhado da unidade de compostagem; — 50 kW no telhado da estação de triagem de Słajsin na parcela n.o 66/10, n.o 0040. No âmbito do investimento previsto, o candidato especificou as seguintes fases do projeto: 1. Rea...

22 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 20:3320:33, 2 March 2023DG Regio talk contribs 72,578 bytes +948 Changed label, description and/or aliases in da, it, sk, fi, sv, ga, cs, sl, hu, lv, el, fr, ro, pt, hr, nl, de, lt, es, et, bg, mt, and other parts

27 October 2022

26 October 2022

21 October 2022

3 July 2022

  • curprev 01:1101:11, 3 July 2022DG Regio talk contribs 69,510 bytes +44,276 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 21:5321:53, 2 December 2021DG Regio talk contribs 15,432 bytes +2,369 Created claim: summary (P836): L’investissement prévu est stationnaire et consistera en la construction d’installations photovoltaïques sur les toits de l’usine de tri et de compostage de l’usine régionale de gestion des déchets d’une capacité totale de 400 kW, dont: — 350 kW sur le toit de l’usine de compostage; — 50 kW sur le toit de l’usine de tri à Słajsin sur la parcelle no 66/10, zone no 0040. Dans le cadre de l’investissement prévu, la requérante a précisé les étapes s...
  • curprev 21:5321:53, 2 December 2021DG Regio talk contribs 13,063 bytes +196 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:2119:21, 21 October 2020DG Regio talk contribs 13,306 bytes +177 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:2119:21, 21 October 2020DG Regio talk contribs 13,129 bytes −182 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:2119:21, 21 October 2020DG Regio talk contribs 13,311 bytes +2,148 Created claim: summary (P836): The planned investment is stationary and will consist of the construction of photovoltaic installations on the roofs of the sorting plant and composting plant of the Regional Waste Management Plant with a total capacity of 400 kW, including: — 350 kW on the roof of the composting plant; — 50 kW on the roof of the Słajsin sorting plant on plot No. 66/10, No. 0040. As part of the planned investment, the applicant specified the following stages of...
  • curprev 19:2119:21, 21 October 2020DG Regio talk contribs 11,163 bytes −1,717 Removed claim: summary (P836): The investment planned for the implementation of the investment is stationary and will consist of the construction of a photovoltaic installation on the roof of a sorting plant and a composting plant for a total capacity of 400 kW, including: — 350 kW on the roof of the composting plants; — 50 kW on top of the sorting area on plot No 66/10, No 0040. As part of the planned investment, the Applicant has specified the following steps in the imple...

24 September 2020

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:0410:04, 11 March 2020DG Regio talk contribs 11,590 bytes +1,717 Created claim: summary (P836): The investment planned for the implementation of the investment is stationary and will consist of the construction of a photovoltaic installation on the roof of a sorting plant and a composting plant for a total capacity of 400 kW, including: — 350 kW on the roof of the composting plants; — 50 kW on top of the sorting area on plot No 66/10, No 0040. As part of the planned investment, the Applicant has specified the following steps in the impleme...

25 February 2020

18 February 2020

31 January 2020

14 January 2020