Revision history of "Construction of solar photovoltaic installation for the operation of Durable Sp. z o. o. in Przecław." (Q137784)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 05:4605:46, 10 October 2024DG Regio talk contribs 91,487 bytes −38 Changed label, description and/or aliases in pt
  • curprev 05:4605:46, 10 October 2024DG Regio talk contribs 91,525 bytes −32 Set a claim value: summary (P836): A execução do projeto é estacionária. O projeto será localizado em locais. Kołbaskowo, Politbursk, Westopom. O projeto consiste na construção de uma instalação fotovoltaica com uma potência de 39,52 kW. A instalação será instalada nas instalações de propriedade do investidor nas instalações das parcelas n.os 7/8 e 7/24, a área de 0012 Przecław. A instalação será instalada em dois edifícios: uma parte da instalação de 10,92kWp (42 células) será insta...

20 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 20:3320:33, 2 March 2023DG Regio talk contribs 88,383 bytes +2,479 Changed label, description and/or aliases in lv, da, it, sk, bg, cs, fr, hu, pt, mt, fi, hr, ro, ga, sv, el, et, es, de, lt, nl, sl, and other parts

27 October 2022

26 October 2022

21 October 2022

3 July 2022

  • curprev 01:1101:11, 3 July 2022DG Regio talk contribs 83,787 bytes +54,055 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 21:5321:53, 2 December 2021DG Regio talk contribs 17,447 bytes +3,006 Created claim: summary (P836): La mise en œuvre du projet est stationnaire. Le projet sera situé dans des endroits. Przecław, Kołbaskowo, région de politsk, voïvodie de Westopom. Le projet consiste en la construction d’une installation photovoltaïque d’une capacité de 39,52 kW. L’installation sera installée sur la propriété détenue par l’investisseur sur les parcelles nos 7/8 et 7/24, zone 0012 Przecław. L’installation sera installée sur deux bâtiments: une partie de l’instal...
  • curprev 21:5321:53, 2 December 2021DG Regio talk contribs 14,441 bytes +175 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:2119:21, 21 October 2020DG Regio talk contribs 14,705 bytes +162 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:2119:21, 21 October 2020DG Regio talk contribs 14,543 bytes −161 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:2119:21, 21 October 2020DG Regio talk contribs 14,704 bytes +2,796 Created claim: summary (P836): The implementation of the project is stationary. The project will be located in places. Kołbaskowo, Politbursk, Westopom. The project consists of the construction of a photovoltaic installation with a power of 39.52 kW. The installation will be installed on the premises owned by the investor on the premises of plots No 7/8 and 7/24, the area of 0012 Przecław. The installation will be installed on two buildings: a part of the 10.92kWp (42 cells)...
  • curprev 19:2119:21, 21 October 2020DG Regio talk contribs 11,908 bytes −2,350 Removed claim: summary (P836): The project is carried out on a stationary basis. The project will be located in places. Pcławy, Gom Kolbaskowo, Pycki, West’s province. The project consists of the construction of a 39.52 kW photovoltaic power plant. The installation will be mounted on the premises, which are the property of the investor, within the area of parcels 7/8 and 7/24, of the perimeter of 0012 Dcławy. The installation will be mounted on two buildings: part of the 10...

24 September 2020

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:0410:04, 11 March 2020DG Regio talk contribs 12,965 bytes +2,350 Created claim: summary (P836): The project is carried out on a stationary basis. The project will be located in places. Pcławy, Gom Kolbaskowo, Pycki, West’s province. The project consists of the construction of a 39.52 kW photovoltaic power plant. The installation will be mounted on the premises, which are the property of the investor, within the area of parcels 7/8 and 7/24, of the perimeter of 0012 Dcławy. The installation will be mounted on two buildings: part of the 10,9...

25 February 2020

18 February 2020

31 January 2020

14 January 2020