Revision history of "Creation of photovoltaic micro-installation for the “Coast” Housing Cooperative in Sławow" (Q137775)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 04:1804:18, 11 October 2024DG Regio talk contribs 62,386 bytes −6 Changed label, description and/or aliases in pt
  • curprev 04:1804:18, 11 October 2024DG Regio talk contribs 62,392 bytes −39 Set a claim value: summary (P836): O projeto estacionário diz respeito à construção de 8 microinstalações fotovoltaicas com uma potência total de 34,5 kW no telhado de blocos residenciais e à construção da sede da Spóldzielnia. O investimento reduzirá os custos incorridos na compra de eletricidade, melhorará a competitividade da Cooperativa, reduzirá a poluição do ar na região, reduzirá as emissões de CO2. De acordo com estimativas preliminares, o requerente poderá obter até 33 108 M...

23 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

21 October 2022

27 July 2022

  • curprev 18:3018:30, 27 July 2022DG Regio talk contribs 56,244 bytes +34,666 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 21:5321:53, 2 December 2021DG Regio talk contribs 13,897 bytes +1,785 Created claim: summary (P836): Le projet fixe concerne la construction de 8 microstations PV d’une puissance totale de 34,5 kW sur le toit des unités résidentielles et la construction du siège de la Spóldzielnia. L’investissement permettra de réduire les coûts d’achat d’électricité, d’améliorer la compétitivité de la coopérative, de réduire la pollution atmosphérique dans la région et de réduire les émissions de CO2. Selon des estimations préliminaires, la requérante sera en...
  • curprev 21:5321:53, 2 December 2021DG Regio talk contribs 12,112 bytes +173 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:2119:21, 21 October 2020DG Regio talk contribs 12,378 bytes +153 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:2119:21, 21 October 2020DG Regio talk contribs 12,225 bytes −142 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:2119:21, 21 October 2020DG Regio talk contribs 12,367 bytes +1,694 Created claim: summary (P836): The stationary project concerns the construction of 8 PV microinstlations with a total power capacity of 34.5 kW on the roof of residential blocks and the building of the seat of Spóldzielnia. The investment will reduce costs incurred in the purchase of electricity, improve the competitiveness of the Cooperative, reduce air pollution in the region, reduce CO2 emissions. According to preliminary estimates, the applicant will be able to obtain up...
  • curprev 19:2119:21, 21 October 2020DG Regio talk contribs 10,673 bytes −1,297 Removed claim: summary (P836): The stationary project relates to the construction of 8 micro-reins of PV with a total power output of 34.5 kW on the roof of the apartment blocks and on the building of the Cohesion Office. The investment will reduce the costs incurred for the purchase of electricity, improve the competitiveness of the cooperative, reduce air pollution in the region, reduce CO2 emissions. According to provisional estimates, the applicant will be able to obtai...

24 September 2020

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:0410:04, 11 March 2020DG Regio talk contribs 10,690 bytes +1,297 Created claim: summary (P836): The stationary project relates to the construction of 8 micro-reins of PV with a total power output of 34.5 kW on the roof of the apartment blocks and on the building of the Cohesion Office. The investment will reduce the costs incurred for the purchase of electricity, improve the competitiveness of the cooperative, reduce air pollution in the region, reduce CO2 emissions. According to provisional estimates, the applicant will be able to obtain...

25 February 2020

18 February 2020

31 January 2020

14 January 2020