Revision history of "Construction of a photovoltaic installation for the needs of the Cultural and Recreation Centre in Born Sulinów." (Q137769)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:2606:26, 9 October 2024DG Regio talk contribs 85,788 bytes −4 Changed label, description and/or aliases in pt
  • curprev 06:2606:26, 9 October 2024DG Regio talk contribs 85,792 bytes −91 Set a claim value: summary (P836): O projecto será realizado em Dz. N.o 37/123, Borne 06, Borne Sulinowo, Borne Sulinowo, distrito de Szczecin, voivodia de Zachodniopomorskie. Consistirá na construção de uma instalação fotovoltaica de produção de eletricidade a partir de FER para o edifício de utilidade pública, ou seja, o Sports Hall – Centre for Culture and Recreation em Born Sulinowo. A instalação baseia-se em painéis fotovoltaicos e inversores. A potência total será de 9,76 kW. A...

23 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 20:3320:33, 2 March 2023DG Regio talk contribs 82,709 bytes +1,770 Changed label, description and/or aliases in lv, it, sk, da, ga, lt, fr, el, fi, et, ro, nl, cs, pt, hr, sv, sl, de, es, hu, bg, mt, and other parts

27 October 2022

26 October 2022

21 October 2022

3 July 2022

  • curprev 01:1001:10, 3 July 2022DG Regio talk contribs 78,815 bytes +50,770 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 21:2921:29, 2 December 2021DG Regio talk contribs 16,720 bytes +2,848 Created claim: summary (P836): Le projet sera réalisé au no 37/123, Borne 06, à Borne Sulinowo, Borne Sulinowo, comté de Szczecin, voïvodie de Poméranie occidentale. Il consistera en la construction d’une installation photovoltaïque produisant de l’électricité à partir de SER pour les besoins d’un bâtiment public, c’est-à-dire Salle de sport — Centre pour la culture et les loisirs à Born Sulinów. L’installation sera basée sur des panneaux photovoltaïques et des onduleurs. Sa...
  • curprev 21:2921:29, 2 December 2021DG Regio talk contribs 13,872 bytes +166 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:2119:21, 21 October 2020DG Regio talk contribs 14,145 bytes +173 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:2119:21, 21 October 2020DG Regio talk contribs 13,972 bytes −160 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:2119:21, 21 October 2020DG Regio talk contribs 14,132 bytes +2,516 Created claim: summary (P836): The project will be carried out on Dz. No 37/123, Borne 06, Borne Sulinowo, Borne Sulinowo, Szczecin County, Zachodniopomorskie Voivodeship. It will consist of the construction of a photovoltaic installation producing electricity from RES for the public utility building, i.e. Sports Hall – Centre for Culture and Recreation in Born Sulinowo. The installation is based on photovoltaic panels and inverters. Its total power will be 9.76 kW. Energy is...
  • curprev 19:2119:21, 21 October 2020DG Regio talk contribs 11,616 bytes −2,144 Removed claim: summary (P836): The project will be carried out on sheet No 37/123, by the Bone Borne 06, and in M. Borne Sulinowo, District of Borne Sulinovo District, in Zachodniopomorskie Province. Rely on the construction of a photovoltaic installation that produces electricity from RES for a public utility, i.e. Sports hall — Centre for Culture and Recreation in Bornem Sulinov. The installation will be constructed on the basis of solar panels and inverters. It will have...

24 September 2020

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:0410:04, 11 March 2020DG Regio talk contribs 12,473 bytes +2,144 Created claim: summary (P836): The project will be carried out on sheet No 37/123, by the Bone Borne 06, and in M. Borne Sulinowo, District of Borne Sulinovo District, in Zachodniopomorskie Province. Rely on the construction of a photovoltaic installation that produces electricity from RES for a public utility, i.e. Sports hall — Centre for Culture and Recreation in Bornem Sulinov. The installation will be constructed on the basis of solar panels and inverters. It will have a...

25 February 2020

18 February 2020

31 January 2020

14 January 2020