Revision history of "Eco-investment reducing greenhouse gas emissions through the implementation of renewable energy sources on the site of the Mission of Our Lady of Light – Centre for the Renewal of Spiritual Life" (Q137767)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 04:1804:18, 11 October 2024DG Regio talk contribs 90,922 bytes +1 Changed label, description and/or aliases in pt
  • curprev 04:1804:18, 11 October 2024DG Regio talk contribs 90,921 bytes −58 Set a claim value: summary (P836): A execução do projeto é composta por dois âmbitos. Em primeiro lugar, está prevista a construção de uma instalação fotovoltaica, que será quantificada pelo volume de eletricidade solar produzida em células fotovoltaicas. O segundo intervalo é a construção de bombas de calor e uma caldeira de biomassa (pelet), de modo que a demanda por calor será amplamente satisfeita por energia proveniente de fontes renováveis. O investimento previsto é muito impor...

23 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 19:3519:35, 2 March 2023DG Regio talk contribs 87,805 bytes +1,292 Changed label, description and/or aliases in lv, it, sk, da, fi, fr, et, pt, ga, cs, ro, sl, bg, lt, nl, hr, es, sv, mt, el, de, hu, and other parts

27 October 2022

26 October 2022

21 October 2022

27 July 2022

  • curprev 18:3018:30, 27 July 2022DG Regio talk contribs 84,393 bytes +54,533 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 21:2921:29, 2 December 2021DG Regio talk contribs 17,607 bytes +3,095 Created claim: summary (P836): La mise en œuvre du projet en question se compose de deux domaines. Premièrement, la construction d’une installation photovoltaïque est envisagée et sera quantifiée par la quantité d’électricité solaire produite dans les cellules photovoltaïques. La deuxième gamme est la construction d’une centrale thermique, c’est-à-dire de pompes à chaleur et d’une chaudière à biomasse (pelet), de sorte que la demande de chaleur sera largement satisfaite par l...
  • curprev 21:2921:29, 2 December 2021DG Regio talk contribs 14,512 bytes +297 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:2119:21, 21 October 2020DG Regio talk contribs 14,654 bytes +256 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:2119:21, 21 October 2020DG Regio talk contribs 14,398 bytes −233 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:2119:21, 21 October 2020DG Regio talk contribs 14,631 bytes +2,620 Created claim: summary (P836): The implementation of the project consists of two scopes. Firstly, the construction of a photovoltaic installation is envisaged and will be quantified by the volume of solar electricity produced in photovoltaic cells. The second range is the construction of heat pumps and a biomass boiler (pelet), so the demand for heat will be largely met by energy from renewable sources. The planned investment is very important not only for the region in which...
  • curprev 19:2119:21, 21 October 2020DG Regio talk contribs 12,011 bytes −2,135 Removed claim: summary (P836): The implementation of the project consists of two bands. Firstly, the construction of a photovoltaic installation is planned and will be quantified by the amount of solar electricity produced in photovoltaic cells. The second range is the construction of the thermal installation, i.e. the heat pumps and the biomass boiler (pelet), so the demand for heat will be largely covered by renewable energy. The planned investment is very important not o...

25 September 2020

24 September 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:0410:04, 11 March 2020DG Regio talk contribs 12,863 bytes +2,135 Created claim: summary (P836): The implementation of the project consists of two bands. Firstly, the construction of a photovoltaic installation is planned and will be quantified by the amount of solar electricity produced in photovoltaic cells. The second range is the construction of the thermal installation, i.e. the heat pumps and the biomass boiler (pelet), so the demand for heat will be largely covered by renewable energy. The planned investment is very important not onl...

25 February 2020

18 February 2020

31 January 2020

14 January 2020