Revision history of "Construction of a photovoltaic power plant together with infrastructure accompanying the facilities of the Independent Public Clinical Hospital No. 1 PUM in Szczecin." (Q137764)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 16:3916:39, 10 October 2024DG Regio talk contribs 76,093 bytes +6 Changed label, description and/or aliases in pt
  • curprev 16:3916:39, 10 October 2024DG Regio talk contribs 76,087 bytes −49 Set a claim value: summary (P836): O projeto consiste na construção e montagem de uma central fotovoltaica nas instalações do Hospital Clínico Público Independente n.o 1 PUM em Szczecin, na parcela n.o 91, perímetro 2061. O âmbito do projeto inclui a entrega, construção e entrada em funcionamento de uma central fotovoltaica de 740,60 kW, composta por 2116 unidades de painéis fotovoltaicos monocristalinos (cada um com uma potência de 350 W), juntamente com a infraestrutura de acompanh...

20 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 20:3320:33, 2 March 2023DG Regio talk contribs 72,965 bytes +450 Changed label, description and/or aliases in da, it, sk, fi, cs, lv, de, ga, sv, el, bg, pt, ro, et, sl, hu, nl, lt, hr, es, mt, and other parts

27 October 2022

26 October 2022

21 October 2022

3 July 2022

  • curprev 01:1001:10, 3 July 2022DG Regio talk contribs 70,404 bytes +44,847 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 21:2921:29, 2 December 2021DG Regio talk contribs 15,711 bytes +2,388 Created claim: summary (P836): Le projet consiste en la construction et l’installation d’une centrale photovoltaïque dans les locaux de l’hôpital clinique public indépendant no 1 PUM à Szczecin, sur le terrain no 91, volume 2061. Le projet comprend la fourniture, la construction et la mise en service d’une centrale photovoltaïque de 740,60 kW, composée de 2116 panneaux photovoltaïques monocristallins (chacun 350 W) et des infrastructures connexes (c’est-à-dire 38 onduleurs d’...
  • curprev 21:2921:29, 2 December 2021DG Regio talk contribs 13,323 bytes +227 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:2119:21, 21 October 2020DG Regio talk contribs 13,535 bytes +226 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:2119:21, 21 October 2020DG Regio talk contribs 13,309 bytes −219 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:2119:21, 21 October 2020DG Regio talk contribs 13,528 bytes +2,184 Created claim: summary (P836): The project consists of the construction and assembly of a photovoltaic power plant on the premises of the Independent Public Clinical Hospital No. 1 PUM in Szczecin, on plot no. 91, perimeter 2061. The scope of the project includes the delivery, construction and commissioning of a 740.60 kW photovoltaic power plant, consisting of 2116 units of monocrystalline photovoltaic panels (each with a power of 350 W) together with accompanying infrastruc...
  • curprev 19:2119:21, 21 October 2020DG Regio talk contribs 11,344 bytes −1,645 Removed claim: summary (P836): The project consists of the construction and installation of a photovoltaic power plant at the premises of the Autonomous Public Hospital of Clinical Hospital No 1 PUM, in Szczecin, on plot No 91, area 2061. The scope of the project covers the delivery, construction and launch of a 740.60 kW photovoltaic power plant consisting of 2116 single crystal panels (each with a power of 350 W) with ancillary infrastructure (i.e., 38 inverters with a po...

24 September 2020

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:0410:04, 11 March 2020DG Regio talk contribs 11,699 bytes +1,645 Created claim: summary (P836): The project consists of the construction and installation of a photovoltaic power plant at the premises of the Autonomous Public Hospital of Clinical Hospital No 1 PUM, in Szczecin, on plot No 91, area 2061. The scope of the project covers the delivery, construction and launch of a 740.60 kW photovoltaic power plant consisting of 2116 single crystal panels (each with a power of 350 W) with ancillary infrastructure (i.e., 38 inverters with a powe...

25 February 2020

18 February 2020

31 January 2020

14 January 2020