Revision history of "Construction of a photovoltaic farm up to 1 MW with the necessary technical infrastructure and connection to the power grid in Dębica" (Q137744)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:3018:30, 9 October 2024DG Regio talk contribs 90,681 bytes −25 Changed label, description and/or aliases in pt
  • curprev 18:3018:30, 9 October 2024DG Regio talk contribs 90,706 bytes +1 Set a claim value: summary (P836): O projeto tem por objeto a construção de uma exploração fotovoltaica com uma capacidade máxima de 1 MW na aldeia de Dębica, em parcelas de terreno com o n.o 128/2. O projecto é estacionário e consistirá numa fase da construção de uma quinta. No âmbito do projeto, o candidato adquirirá uma instalação fotovoltaica com os elementos necessários, ou seja, estruturas para painéis fotovoltaicos, painéis fotovoltaicos e inversores. De acordo com o projeto a...

20 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

3 March 2023

  • curprev 01:2001:20, 3 March 2023DG Regio talk contribs 87,531 bytes +140 Changed label, description and/or aliases in da, it, sk, fi, et, ro, lv, ga, es, pt, hr, sv, hu, lt, fr, bg, sl, nl, mt, de, cs, el, and other parts

27 October 2022

26 October 2022

21 October 2022

3 July 2022

  • curprev 01:0801:08, 3 July 2022DG Regio talk contribs 85,268 bytes +55,249 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 21:5121:51, 2 December 2021DG Regio talk contribs 17,619 bytes +3,111 Created claim: summary (P836): Le projet concerne la construction d’une exploitation photovoltaïque d’une capacité maximale de 1 MW à Dębica sur des parcelles de terrain no 128/2. Le projet est stationnaire et consistera en une seule étape consistant en la construction d’une ferme. Dans le cadre de la mise en œuvre du projet, la requérante achètera une installation photovoltaïque comportant les éléments nécessaires, à savoir les constructions de panneaux photovoltaïques, de p...
  • curprev 21:5121:51, 2 December 2021DG Regio talk contribs 14,508 bytes +241 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:2019:20, 21 October 2020DG Regio talk contribs 14,706 bytes +194 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:2019:20, 21 October 2020DG Regio talk contribs 14,512 bytes −195 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:2019:20, 21 October 2020DG Regio talk contribs 14,707 bytes +2,775 Created claim: summary (P836): The subject of the project is the construction of a photovoltaic farm with a capacity of up to 1 MW in the village of Dębica on parcels of lands with no. 128/2. The project is stationary and will consist of one stage of the construction of a farm. As part of the project, the applicant will purchase a photovoltaic installation with the necessary elements, i.e. structures for photovoltaic panels, photovoltaic panels and inverters. According to the...
  • curprev 19:2019:20, 21 October 2020DG Regio talk contribs 11,932 bytes −2,202 Removed claim: summary (P836): The project is the construction of a 1-MW photovoltaic power plant in Dębica on plots No 128/2. The project is stationary and will consist of a single farm. As part of the project, the applicant will purchase a photovoltaic installation with the necessary elements, i.e. the construction of photovoltaic panels, solar panels and inverters. According to the current draft, 3630 panels are planned to be installed each 265W; 3630 * 265W = 961950W In...

24 September 2020

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:0310:03, 11 March 2020DG Regio talk contribs 12,844 bytes +2,202 Created claim: summary (P836): The project is the construction of a 1-MW photovoltaic power plant in Dębica on plots No 128/2. The project is stationary and will consist of a single farm. As part of the project, the applicant will purchase a photovoltaic installation with the necessary elements, i.e. the construction of photovoltaic panels, solar panels and inverters. According to the current draft, 3630 panels are planned to be installed each 265W; 3630 * 265W = 961950W In v...

25 February 2020

18 February 2020

31 January 2020

14 January 2020