Revision history of "Construction of a photovoltaic farm Zacisze I with a capacity of up to 1 MW together with the necessary technical infrastructure and connection to the power grid in Mirosławiec" (Q137743)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:3018:30, 9 October 2024DG Regio talk contribs 90,397 bytes +18 Changed label, description and/or aliases in pt
  • curprev 18:3018:30, 9 October 2024DG Regio talk contribs 90,379 bytes −84 Set a claim value: summary (P836): O projeto tem por objeto a construção de uma exploração fotovoltaica com uma capacidade máxima de 1 MW em Mirosławiec, em parcelas de 244 e 245. O projecto é estacionário e consistirá numa fase da construção de uma quinta. No âmbito do projeto, o candidato adquirirá uma instalação fotovoltaica com os elementos necessários, ou seja, estruturas para painéis fotovoltaicos, painéis fotovoltaicos e inversores. De acordo com o projeto atual, está prevista...

12 March 2024

13 December 2023

6 July 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 20:3320:33, 2 March 2023DG Regio talk contribs 88,011 bytes +832 Changed label, description and/or aliases in lv, da, sk, it, cs, et, fr, hu, el, ga, ro, fi, pt, lt, bg, sv, hr, nl, mt, es, sl, de, and other parts

27 October 2022

26 October 2022

21 October 2022

27 July 2022

  • curprev 18:3018:30, 27 July 2022DG Regio talk contribs 85,100 bytes +54,948 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 21:5121:51, 2 December 2021DG Regio talk contribs 17,549 bytes +3,092 Created claim: summary (P836): Le projet concerne la construction d’une exploitation photovoltaïque d’une capacité maximale de 1 MW à Mirosławiec sur des parcelles de terrain nos 244 et 245. Le projet est stationnaire et consistera en une seule étape consistant en la construction d’une ferme. Dans le cadre de la mise en œuvre du projet, la requérante achètera une installation photovoltaïque comportant les éléments nécessaires, à savoir les constructions de panneaux photovolta...
  • curprev 21:5121:51, 2 December 2021DG Regio talk contribs 14,457 bytes +252 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:2019:20, 21 October 2020DG Regio talk contribs 14,644 bytes +237 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:2019:20, 21 October 2020DG Regio talk contribs 14,407 bytes −231 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:2019:20, 21 October 2020DG Regio talk contribs 14,638 bytes +2,711 Created claim: summary (P836): The subject of the project is the construction of a photovoltaic farm with a capacity of up to 1 MW in Mirosławiec on plots of 244 and 245. The project is stationary and will consist of one stage of the construction of a farm. As part of the project, the applicant will purchase a photovoltaic installation with the necessary elements, i.e. structures for photovoltaic panels, photovoltaic panels and inverters. According to the current project, 319...
  • curprev 19:2019:20, 21 October 2020DG Regio talk contribs 11,927 bytes −2,222 Removed claim: summary (P836): The project consists of the construction of a 1-MW photovoltaic power plant in the town of Mirosławiec on plots Nos 244 and 245. The project is stationary and will consist of a single farm. As part of the project, the applicant will purchase a photovoltaic installation with the necessary elements, i.e. the construction of photovoltaic panels, solar panels and inverters. According to the current draft, 3190 panels are planned to be installed ea...

24 September 2020

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:0310:03, 11 March 2020DG Regio talk contribs 12,857 bytes +2,222 Created claim: summary (P836): The project consists of the construction of a 1-MW photovoltaic power plant in the town of Mirosławiec on plots Nos 244 and 245. The project is stationary and will consist of a single farm. As part of the project, the applicant will purchase a photovoltaic installation with the necessary elements, i.e. the construction of photovoltaic panels, solar panels and inverters. According to the current draft, 3190 panels are planned to be installed each...

25 February 2020

18 February 2020

31 January 2020

14 January 2020