Revision history of "Construction of a 986 kW photovoltaic farm with the necessary technical infrastructure and connection to the power grid in Pomierzn" (Q137742)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:3018:30, 9 October 2024DG Regio talk contribs 91,398 bytes −1 Changed label, description and/or aliases in pt
  • curprev 18:3018:30, 9 October 2024DG Regio talk contribs 91,399 bytes −9 Set a claim value: summary (P836): O objeto do projeto é a construção de uma exploração fotovoltaica com uma capacidade de 0,986 MW Medições em parcelas com possíveis 88/1 e 88/3. O projecto é estacionário e consistirá numa fase da construção de uma quinta. No âmbito do projeto, o candidato adquirirá uma instalação fotovoltaica completa com os elementos necessários, ou seja, estruturas para painéis, painéis e inversores. De acordo com o projeto atual, está prevista a instalação de 3...

20 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 20:3320:33, 2 March 2023DG Regio talk contribs 88,234 bytes +211 Changed label, description and/or aliases in lv, fr, ro, da, it, sk, de, cs, es, bg, hr, fi, hu, et, sv, sl, pt, ga, nl, el, lt, mt, and other parts

27 October 2022

26 October 2022

21 October 2022

3 July 2022

  • curprev 01:0801:08, 3 July 2022DG Regio talk contribs 85,904 bytes +55,772 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 21:5121:51, 2 December 2021DG Regio talk contribs 17,624 bytes +3,094 Created claim: summary (P836): L’objet du projet est la construction d’une ferme photovoltaïque d’une capacité de 0,986 MW Mesure sur les parcelles 88/1 et 88/3. Le projet est stationnaire et consistera en une seule étape consistant en la construction d’une ferme. Dans le cadre de la mise en œuvre du projet, la requérante achètera une installation photovoltaïque complète avec les éléments nécessaires, à savoir la construction de panneaux, panneaux et onduleurs. Selon le proje...
  • curprev 21:5121:51, 2 December 2021DG Regio talk contribs 14,530 bytes +210 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:2019:20, 21 October 2020DG Regio talk contribs 14,759 bytes +191 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:2019:20, 21 October 2020DG Regio talk contribs 14,568 bytes −211 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:2019:20, 21 October 2020DG Regio talk contribs 14,779 bytes +2,812 Created claim: summary (P836): The subject of the project is the construction of a photovoltaic farm with a capacity of 0.986 MW Measurements on plots with possible 88/1 and 88/3. The project is stationary and will consist of one stage of the construction of a farm. As part of the project, the applicant will purchase a complete photovoltaic installation with the necessary elements, i.e. structures for panels, panels and inverters. According to the current project, 3 944 panel...
  • curprev 19:2019:20, 21 October 2020DG Regio talk contribs 11,967 bytes −2,243 Removed claim: summary (P836): The object of the project is the construction of a 0.986 MW Podmierzyn farm on plots No 88/1 and 88/3. The project is stationary and will consist of a single farm. As part of the project, the applicant will purchase a complete photovoltaic installation with the necessary elements, i.e. the construction of panels, panels and inverters. According to the current draft, 3 944 panels are planned to be installed each 250W; 3960x250W = 986000W In vie...

24 September 2020

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:0310:03, 11 March 2020DG Regio talk contribs 12,925 bytes +2,243 Created claim: summary (P836): The object of the project is the construction of a 0.986 MW Podmierzyn farm on plots No 88/1 and 88/3. The project is stationary and will consist of a single farm. As part of the project, the applicant will purchase a complete photovoltaic installation with the necessary elements, i.e. the construction of panels, panels and inverters. According to the current draft, 3 944 panels are planned to be installed each 250W; 3960x250W = 986000W In view...

25 February 2020

18 February 2020

31 January 2020

14 January 2020