9 October 2024

  • curprev 18:3018:30, 9 October 2024DG Regio talk contribs 74,674 bytes +9 Changed label, description and/or aliases in pt
  • curprev 18:3018:30, 9 October 2024DG Regio talk contribs 74,665 bytes +18 Set a claim value: summary (P836): O projeto previsto pertence a um grupo de projetos fixos. Em resultado do investimento, uma exploração fotovoltaica com uma capacidade de aproximadamente 1999.08 kWp na área da parcela n.o 226/4 de 0017 sobre Gowienica em Stepnica. A central elétrica será construída num sistema de rede – ON GRID. A energia produzida será transferida para a rede elétrica na sua totalidade e vendida a preços de leilão. A energia produzida pelas centrais elétricas será...

20 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 21:4121:41, 2 March 2023DG Regio talk contribs 71,473 bytes +118 Changed label, description and/or aliases in da, it, sk, fi, ga, sv, sl, cs, lv, el, fr, hr, ro, pt, nl, de, es, lt, et, bg, mt, hu, and other parts

27 October 2022

26 October 2022

21 October 2022

3 July 2022

  • curprev 01:0701:07, 3 July 2022DG Regio talk contribs 69,233 bytes +43,986 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 21:5121:51, 2 December 2021DG Regio talk contribs 15,547 bytes +2,366 Created claim: summary (P836): Le projet envisagé appartient à un groupe de projets fixes. Suite à l’investissement, une ferme photovoltaïque d’une capacité d’env. 1999,08 kWp dans la parcelle no 226/4 zone 0017 au-dessus de Gowienica à Stepnica. La centrale électrique sera construite dans le système principal — ON GRID. L’énergie produite sera entièrement transférée au réseau électrique et vendue aux prix gagnants aux enchères. L’énergie produite par les centrales électrique...
  • curprev 21:5121:51, 2 December 2021DG Regio talk contribs 13,181 bytes +119 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:2019:20, 21 October 2020DG Regio talk contribs 13,501 bytes +118 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:2019:20, 21 October 2020DG Regio talk contribs 13,383 bytes −111 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:2019:20, 21 October 2020DG Regio talk contribs 13,494 bytes +2,201 Created claim: summary (P836): The planned project belongs to a group of fixed projects. As a result of the investment, a photovoltaic farm with a capacity of approx. 1999.08 kWp in the area of plot No. 226/4 of 0017 over Gowienica in Stepnica. The power plant will be constructed in a network system – ON GRID. The energy produced will be transferred to the electricity grid in its entirety and sold at auction prices. The energy produced by the power plants will be transferred...
  • curprev 19:2019:20, 21 October 2020DG Regio talk contribs 11,293 bytes −1,761 Removed claim: summary (P836): The project is part of a group of fixed projects. The investment will result in a PV farm with a capacity of approx. 1999,08 kWp on plot No 226/4 rim 0017 over the Gwinica in m. Stepnica. The plant will be built in a network system — the ‘ON GRID’. The energy produced will be fully transferred to the electricity grid and sold at auction winnings. The electricity produced by the power plants will be transferred to the electricity grid at medium...

24 September 2020

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:0310:03, 11 March 2020DG Regio talk contribs 11,760 bytes +1,761 Created claim: summary (P836): The project is part of a group of fixed projects. The investment will result in a PV farm with a capacity of approx. 1999,08 kWp on plot No 226/4 rim 0017 over the Gwinica in m. Stepnica. The plant will be built in a network system — the ‘ON GRID’. The energy produced will be fully transferred to the electricity grid and sold at auction winnings. The electricity produced by the power plants will be transferred to the electricity grid at medium v...

25 February 2020

18 February 2020

31 January 2020

14 January 2020