Revision history of "Promotion of the use of renewable energy sources by ZODR Barzkowice through the construction of a photovoltaic installation in Barzkowice." (Q137736)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:3018:30, 9 October 2024DG Regio talk contribs 86,204 bytes −21 Set a claim value: summary (P836): O projecto é estacionário. A área de construção situa-se em Barzkowice no terreno n.o 51/2 de Barzkowice. O projeto tem por objeto a construção de uma instalação fotovoltaica com uma potência de 38,40 kW – 128 células fotovoltaicas com uma capacidade de 300 Wp cada. Está prevista a instalação de uma instalação fotovoltaica numa estrutura de aço independente.A estrutura será colocada em ligas de betão armado. A energia gerada a partir da instalação s...

22 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

21 October 2022

3 July 2022

  • curprev 01:0701:07, 3 July 2022DG Regio talk contribs 80,644 bytes +51,730 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 21:5121:51, 2 December 2021DG Regio talk contribs 16,982 bytes +2,840 Created claim: summary (P836): Le projet est stationnaire. La zone désignée pour la construction est située à Barzkowice sur le terrain no 51/2 de Barzkowice. L’objet du projet est la construction d’une installation photovoltaïque d’une puissance de 38,40 kW — 128 cellules photovoltaïques d’une puissance de 300 Wp chacune. Il est envisagé de construire une installation photovoltaïque montée sur une structure en acier autoportante.La construction sera basée sur des alliages de...
  • curprev 21:5121:51, 2 December 2021DG Regio talk contribs 14,142 bytes +218 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:2019:20, 21 October 2020DG Regio talk contribs 14,363 bytes +198 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:2019:20, 21 October 2020DG Regio talk contribs 14,165 bytes −183 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:2019:20, 21 October 2020DG Regio talk contribs 14,348 bytes +2,624 Created claim: summary (P836): The project is stationary. The area for construction is located in Barzkowice on plot no. 51/2 of Barzkowice. The subject of the project is the construction of a photovoltaic installation with a power of 38.40 kW – 128 photovoltaic cells with a capacity of 300Wp each. A photovoltaic installation is planned to be installed on a free-standing steel structure.The structure will be placed on reinforced concrete alloys. The energy generated from the...
  • curprev 19:2019:20, 21 October 2020DG Regio talk contribs 11,724 bytes −2,222 Removed claim: summary (P836): The project is stationary. The area for construction is located in Barzkowice, on plot No 51/2, of Barzkowice. The project consists of the construction of a 38.40 kW photovoltaic power plant with 128Wp each. The installation of a mounted photovoltaic installation on a free-standing steel construction is foreseen. The energy obtained from the installation will be used for the operation of ZODR in Barzkowice. THE PHASES OF THE IMPLEMENTATION OF...

24 September 2020

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:0310:03, 11 March 2020DG Regio talk contribs 12,651 bytes +2,222 Created claim: summary (P836): The project is stationary. The area for construction is located in Barzkowice, on plot No 51/2, of Barzkowice. The project consists of the construction of a 38.40 kW photovoltaic power plant with 128Wp each. The installation of a mounted photovoltaic installation on a free-standing steel construction is foreseen. The energy obtained from the installation will be used for the operation of ZODR in Barzkowice. THE PHASES OF THE IMPLEMENTATION OF TH...

25 February 2020

18 February 2020

31 January 2020

14 January 2020