Revision history of "Implementation of solutions using renewable energy sources for the production of heat, necessary for the proper functioning of Konsbud in Stobno." (Q137728)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:2606:26, 9 October 2024DG Regio talk contribs 89,355 bytes +7 Changed label, description and/or aliases in pt
  • curprev 06:2606:26, 9 October 2024DG Regio talk contribs 89,348 bytes −4 Set a claim value: summary (P836): O projecto é estacionário. Será localizado nos locais Stobno, Kołbaskowo, Politbursk, voivodias Zachodniopom. O projeto consistirá na substituição de um forno a gás por um pélete (biomassa) com uma capacidade de instalação de 69 kW. A instalação prevê a transformação da produção de resíduos sob a forma de serradura, serradura, sucata, blocos (pellet) em combustível utilizado para o aquecimento da produção e do edifício de escritórios do requerente....

12 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 20:3320:33, 2 March 2023DG Regio talk contribs 86,178 bytes +777 Changed label, description and/or aliases in da, it, sk, lv, fi, cs, hr, ga, pt, sv, hu, et, de, bg, ro, nl, es, fr, lt, el, mt, sl, and other parts

27 October 2022

26 October 2022

21 October 2022

3 July 2022

  • curprev 01:0701:07, 3 July 2022DG Regio talk contribs 83,283 bytes +53,862 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 21:5121:51, 2 December 2021DG Regio talk contribs 17,187 bytes +2,974 Created claim: summary (P836): Le projet est stationnaire. Il sera situé dans les endroits Stobno, Kołbaskowo, la région de Policki, la voïvodie de Poméranie occidentale. Le projet consistera à remplacer un four à gaz par un four à granulés (biomasse) d’une capacité de 69 kW. L’installation prévoit le traitement des déchets de production sous la forme de copeaux, de sciures, de débris, de blocs (pellets) en combustible utilisé pour chauffer la production et l’immeuble de bure...
  • curprev 21:5121:51, 2 December 2021DG Regio talk contribs 14,213 bytes +236 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:2019:20, 21 October 2020DG Regio talk contribs 14,416 bytes +205 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:2019:20, 21 October 2020DG Regio talk contribs 14,211 bytes −221 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:2019:20, 21 October 2020DG Regio talk contribs 14,432 bytes +2,652 Created claim: summary (P836): The project is stationary. It will be located in the places Stobno, Kołbaskowo, Politbursk, voivodeships Zachodniopom. The project will consist of replacing a gas furnace for a pellet (biomass) with an installation capacity of 69 kW. The installation provides for the processing of waste production in the form of sawdust, sawdust, scraps, blocks (pellet) into fuel used for heating the production and office building of the Applicant. Currently, th...
  • curprev 19:2019:20, 21 October 2020DG Regio talk contribs 11,780 bytes −2,165 Removed claim: summary (P836): The project is stationary. The location will be located at Stobno, Gm Kolbaskowo, Policki, West Berlin. The project will consist of the replacement of a gas furnace into a pipeline furnace (biomass) with a capacity of 69 kW. The installation provides for the processing of waste to be used for heating the Applicant’s production and office buildings. Currently the fuel used to heat the building is the natural gas to be replaced by biomass. THE P...

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:0310:03, 11 March 2020DG Regio talk contribs 12,663 bytes +2,165 Created claim: summary (P836): The project is stationary. The location will be located at Stobno, Gm Kolbaskowo, Policki, West Berlin. The project will consist of the replacement of a gas furnace into a pipeline furnace (biomass) with a capacity of 69 kW. The installation provides for the processing of waste to be used for heating the Applicant’s production and office buildings. Currently the fuel used to heat the building is the natural gas to be replaced by biomass. THE PHA...

25 February 2020

18 February 2020

31 January 2020

14 January 2020