9 October 2024

  • curprev 18:3018:30, 9 October 2024DG Regio talk contribs 68,702 bytes −1 Changed label, description and/or aliases in pt
  • curprev 18:3018:30, 9 October 2024DG Regio talk contribs 68,703 bytes +4 Set a claim value: summary (P836): O projeto é executado por um projeto fixo e estará localizado no Campo Drawsk em Stary Drawsko (parte 104/1, Stare Drawsko 36, 78-550 Czaplinek). O investimento durará de setembro de 2017 até o final de dezembro de 2017. Dependerá da aquisição e montagem de uma instalação fotovoltaica com uma capacidade de 35,4 kW. A instalação incluirá o custo dos painéis de compra, das construções, dos fios, do inversor, do equipamento de comutação e da mão-de-obr...

23 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 20:3320:33, 2 March 2023DG Regio talk contribs 65,526 bytes +476 Changed label, description and/or aliases in da, it, sk, fr, el, hr, ga, sv, lv, bg, ro, fi, hu, de, et, pt, cs, es, sl, lt, nl, mt, and other parts

27 October 2022

26 October 2022

21 October 2022

3 July 2022

  • curprev 01:0601:06, 3 July 2022DG Regio talk contribs 62,930 bytes +39,589 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 21:3021:30, 2 December 2021DG Regio talk contribs 14,778 bytes +2,130 Created claim: summary (P836): Le projet est mis en œuvre par un projet stationnaire et sera situé dans le camp Drawa à Stary Drawsko (plot 104/1, Stare Drawsko 36, 78-550 Czaplinek). L’investissement se déroulera de septembre 2017 à fin décembre 2017. Il impliquera l’achat et l’installation d’une installation photovoltaïque de 35,4 kW. Le champ d’application de l’installation inclura le coût d’achat de panneaux, de structures, de fils, d’onduleur, d’appareils de commutation...
  • curprev 21:3021:30, 2 December 2021DG Regio talk contribs 12,648 bytes +171 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:2019:20, 21 October 2020DG Regio talk contribs 12,916 bytes +151 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:2019:20, 21 October 2020DG Regio talk contribs 12,765 bytes −149 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:2019:20, 21 October 2020DG Regio talk contribs 12,914 bytes +1,927 Created claim: summary (P836): The project is implemented by a stationary project and will be located in Camp Drawsk in Stary Drawsko (part 104/1, Stare Drawsko 36, 78-550 Czaplinek). The investment will last from September 2017 until the end of December 2017. It will be dependent on the purchase and assembly of a photovoltaic installation with a capacity of 35.4 kW. The installation will include the cost of purchasing panels, constructions, wires, inverter, switchgear and la...
  • curprev 19:2019:20, 21 October 2020DG Regio talk contribs 10,987 bytes −1,422 Removed claim: summary (P836): The project is being carried out with a stationary project and will be located in the campus of the Campu Drawa in Stary Drask (plot 104/1, Stare Drawsko 36, 78-550 Czaplinek). The investment will last from September 2017 to the end of December 2017 on the purchase and installation of 35.4 kW of PV. The installation will cover the purchase of panels, structures, cables, inverters, switchgear and labour. The project will be financed from the co...

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:0510:05, 11 March 2020DG Regio talk contribs 11,115 bytes +1,422 Created claim: summary (P836): The project is being carried out with a stationary project and will be located in the campus of the Campu Drawa in Stary Drask (plot 104/1, Stare Drawsko 36, 78-550 Czaplinek). The investment will last from September 2017 to the end of December 2017 on the purchase and installation of 35.4 kW of PV. The installation will cover the purchase of panels, structures, cables, inverters, switchgear and labour. The project will be financed from the comp...

25 February 2020

18 February 2020

31 January 2020

14 January 2020