Revision history of "CONSTRUCTION OF A 0.96 MW PHOTOVOLTAIC POWER PLANT WITH TECHNICAL INFRASTRUCTURE, AT UL. WRONIA W WALCZ" (Q137718)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 04:1804:18, 11 October 2024DG Regio talk contribs 90,538 bytes −9 Changed label, description and/or aliases in pt
  • curprev 04:1804:18, 11 October 2024DG Regio talk contribs 90,547 bytes +54 Set a claim value: summary (P836): O projeto consiste na construção de uma central fotovoltaica moderna com uma capacidade de 0,96 MW e a área de construção até 2,2 ha na parcela de registo 874/2 na cidade de Walcz (Zona de incorporação especial). O grupo-alvo consumidores de eletricidade (habitantes, empresas, entidades públicas, operador de energia da cidade de Wałcz). O demandante tem direito à propriedade sobre a qual a central elétrica será instalada até 1.1.2050, nos termos do...

20 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 20:3320:33, 2 March 2023DG Regio talk contribs 87,319 bytes −617 Changed label, description and/or aliases in lv, da, it, bg, sk, et, ro, cs, hr, fr, hu, sv, pt, es, lt, de, ga, el, nl, sl, fi, mt, and other parts

27 October 2022

26 October 2022

21 October 2022

3 July 2022

  • curprev 01:0601:06, 3 July 2022DG Regio talk contribs 85,815 bytes +55,921 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 21:2821:28, 2 December 2021DG Regio talk contribs 17,359 bytes +2,992 Created claim: summary (P836): Le projet consiste en la construction d’une centrale photovoltaïque moderne d’une capacité de 0,96 MW et d’une surface bâtie pouvant atteindre 2,2 ha sur un terrain cadastral 874/2 à l’intérieur de la ville de Wałcz (zone spéciale d’inclusion). Le demandeur a droit à la propriété sur laquelle la centrale sera construite jusqu’au 01.01.2050 sur la base du contrat de location no 01/08/2015z dn. 24.08.2015 inscrite au cadastre KW KO1W/00026979/5. L...
  • curprev 21:2821:28, 2 December 2021DG Regio talk contribs 14,367 bytes +181 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:1919:19, 21 October 2020DG Regio talk contribs 14,625 bytes +163 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:1919:19, 21 October 2020DG Regio talk contribs 14,462 bytes −162 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:1919:19, 21 October 2020DG Regio talk contribs 14,624 bytes +2,757 Created claim: summary (P836): The project consists of the construction of a modern photovoltaic power plant with a capacity of 0.96 MW and the area of construction up to 2.2 ha on the registration plot 874/2 within the City of Walcz (Special Incorporation Zone).The target group-consumers of electricity (inhabitants, companies, public entities, energy operator of the city of Wałcz). The applicant has the right to the property on which the power plant will be established until...
  • curprev 19:1919:19, 21 October 2020DG Regio talk contribs 11,867 bytes −2,199 Removed claim: summary (P836): The project consists of the construction of a modern photovoltaic power plant of 0.96 MW and a surface area of up to 2.2 ha on cadastral parcel 874/2 within the town of Walcz (Special Zone of Inclusion). The applicant has the right to the immovable property on which the power plant is created up to 01.01.2050 under the lease agreement No 01/08/2015z 24.08.2015 registered in the land register KW KO1W/00026979/5. The plant will be composed of ph...

24 September 2020

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:0510:05, 11 March 2020DG Regio talk contribs 12,791 bytes +2,199 Created claim: summary (P836): The project consists of the construction of a modern photovoltaic power plant of 0.96 MW and a surface area of up to 2.2 ha on cadastral parcel 874/2 within the town of Walcz (Special Zone of Inclusion). The applicant has the right to the immovable property on which the power plant is created up to 01.01.2050 under the lease agreement No 01/08/2015z 24.08.2015 registered in the land register KW KO1W/00026979/5. The plant will be composed of phot...

25 February 2020

18 February 2020

31 January 2020

14 January 2020