Revision history of "Construction of a photovoltaic farm with installed capacity of 0,99 MW together with the necessary technical infrastructure and connection to the power grid in Kraśnik Koszaliński" (Q137714)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:4618:46, 8 October 2024DG Regio talk contribs 56,593 bytes +13 Changed label, description and/or aliases in pt
  • curprev 18:4618:46, 8 October 2024DG Regio talk contribs 56,580 bytes +24 Set a claim value: summary (P836): O projeto tem por objeto a construção de uma exploração fotovoltaica com uma capacidade de 0,99 MW em Kraśnik Koszaliński, na parcela n.o 153. O projecto é estacionário. No âmbito do projeto, o candidato adquirirá uma instalação fotovoltaica com os elementos necessários e realizará obras na infraestrutura elétrica necessária para o arranque da exploração agrícola. O projeto consistirá numa fase que consiste na construção de uma exploração fotovoltai...

7 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 23:2023:20, 2 March 2023DG Regio talk contribs 53,382 bytes −493 Changed label, description and/or aliases in da, it, ro, sk, fi, et, lv, ga, es, pt, hr, sv, hu, lt, fr, bg, sl, nl, mt, de, cs, el, and other parts

27 October 2022

26 October 2022

21 October 2022

3 July 2022

  • curprev 01:0501:05, 3 July 2022DG Regio talk contribs 51,754 bytes +31,385 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 21:2821:28, 2 December 2021DG Regio talk contribs 13,433 bytes +1,500 Created claim: summary (P836): Le projet concerne la construction d’une ferme photovoltaïque de 0,99 MW à Kraśnik Koszaliński sur la parcelle no 153. Le projet est stationnaire. Dans le cadre de la mise en œuvre du projet, la requérante achètera une installation photovoltaïque avec les éléments nécessaires et réalisera les travaux au sein de l’infrastructure électrique nécessaire au démarrage de l’exploitation. Le projet consistera en une phase de construction d’une ferme pho...
  • curprev 21:2821:28, 2 December 2021DG Regio talk contribs 11,933 bytes +260 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:1919:19, 21 October 2020DG Regio talk contribs 12,112 bytes +241 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:1919:19, 21 October 2020DG Regio talk contribs 11,871 bytes −264 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:1919:19, 21 October 2020DG Regio talk contribs 12,135 bytes +1,469 Created claim: summary (P836): The subject of the project is the construction of a photovoltaic farm with a capacity of 0.99 MW in Kraśnik Koszaliński on plot no. 153. The project is stationary. As part of the project, the applicant will purchase a photovoltaic installation with the necessary elements and carry out works within the electrical infrastructure necessary for the start-up of the farm. The project will consist of one stage consisting of the construction of a photov...
  • curprev 19:1919:19, 21 October 2020DG Regio talk contribs 10,666 bytes −1,013 Removed claim: summary (P836): The object of the project is the construction of a 0.99 MW photovoltaic farm in the town of Krasnik Koszalin on plot (No 153). The project is stationary. As part of the project, the applicant will purchase the photovoltaic equipment with the necessary elements and will carry out the work within the electrical infrastructure necessary for the operation of the farm. The project will consist of a single phase consisting of the construction of a p...

24 September 2020

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:0510:05, 11 March 2020DG Regio talk contribs 10,397 bytes +1,013 Created claim: summary (P836): The object of the project is the construction of a 0.99 MW photovoltaic farm in the town of Krasnik Koszalin on plot (No 153). The project is stationary. As part of the project, the applicant will purchase the photovoltaic equipment with the necessary elements and will carry out the work within the electrical infrastructure necessary for the operation of the farm. The project will consist of a single phase consisting of the construction of a pho...

25 February 2020

18 February 2020

31 January 2020

14 January 2020