Revision history of "Construction of a photovoltaic farm with a total capacity of 0,5 MW – ZPW Pilchowo" (Q137713)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 04:1804:18, 11 October 2024DG Regio talk contribs 94,999 bytes 0 Changed label, description and/or aliases in pt
  • curprev 04:1804:18, 11 October 2024DG Regio talk contribs 94,999 bytes +31 Set a claim value: summary (P836): O projeto consistirá em tarefas: 1)Construção de uma exploração fotovoltaica segundo a fórmula “conceção e construção”, 2)Construção ao longo da construção, 3)Atividades de informação e promoção. É o rabo. 1 consistirá na conceção, construção, fornecimento, montagem e ligação ao sistema elétrico nacional de uma exploração fotovoltaica com uma capacidade total de 0,5 MW, com a entrada em funcionamento e obtenção do documento formal e jurídico necessá...

23 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 20:3720:37, 2 March 2023DG Regio talk contribs 91,794 bytes +270 Changed label, description and/or aliases in lv, da, sk, it, cs, el, ga, et, fr, bg, fi, lt, nl, hr, ro, hu, sv, pt, de, sl, mt, es, and other parts

27 October 2022

26 October 2022

21 October 2022

3 July 2022

  • curprev 01:0501:05, 3 July 2022DG Regio talk contribs 89,415 bytes +58,628 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 21:2821:28, 2 December 2021DG Regio talk contribs 17,675 bytes +3,199 Created claim: summary (P836): Le projet comprendra les tâches suivantes: 1)Construction d’une ferme photovoltaïque dans la formule «conception et construction», 2) supervision de la construction, 3) activités d’information et de promotion. AWW. 1 consistera en la conception, la construction, la fourniture, l’assemblage et le raccordement au réseau électrique national d’une exploitation photovoltaïque d’une capacité totale de 0,5 MW, ainsi que la mise en service et l’obtentio...
  • curprev 21:2821:28, 2 December 2021DG Regio talk contribs 14,476 bytes +154 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:1919:19, 21 October 2020DG Regio talk contribs 14,761 bytes +143 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:1919:19, 21 October 2020DG Regio talk contribs 14,618 bytes −133 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:1919:19, 21 October 2020DG Regio talk contribs 14,751 bytes +2,944 Created claim: summary (P836): The project will consist of tasks: 1)Building a photovoltaic farm in the formula “design and build”, 2)Construction over the construction, 3)Information and promotion activities. It’s the ass. 1 will consist of designing, constructing, supplying, assembling and connecting to the national electricity system a photovoltaic farm with a total capacity of 0.5 MW, with the commissioning and obtaining the required formal and legal doc, necessary for th...
  • curprev 19:1919:19, 21 October 2020DG Regio talk contribs 11,807 bytes −2,491 Removed claim: summary (P836): The project will consist of the following tasks: 1) Construction of a photovoltaic farm under the term ‘design and demolition’, (2) Building supervision, (3) Information and promotion activities. Task 1 it will consist of the design, construction, delivery, assembly and connection to the national electricity system of a power plant with a total capacity of 0.5 MW, together with the commissioning and obtaining the required formal and legal docu...

24 September 2020

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:0510:05, 11 March 2020DG Regio talk contribs 13,007 bytes +2,491 Created claim: summary (P836): The project will consist of the following tasks: 1) Construction of a photovoltaic farm under the term ‘design and demolition’, (2) Building supervision, (3) Information and promotion activities. Task 1 it will consist of the design, construction, delivery, assembly and connection to the national electricity system of a power plant with a total capacity of 0.5 MW, together with the commissioning and obtaining the required formal and legal docume...

25 February 2020

18 February 2020

31 January 2020

14 January 2020