Revision history of "Construction, expansion and modernisation of units producing electricity and heat from RES in public utility buildings, including the necessary connection infrastructure to distribution networks in the municipality of Sławno" (Q137708)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 05:4605:46, 10 October 2024DG Regio talk contribs 93,578 bytes −11 Changed label, description and/or aliases in pt
  • curprev 05:4605:46, 10 October 2024DG Regio talk contribs 93,589 bytes +1,027 Set a claim value: summary (P836): O tema do projeto é a implementação abrangente da tarefa, que incluirá os seguintes elementos: X-55 x x x x x x x x x x x x 83 x x x 21 x x 5 x 4 x 4 x 4 x 0 x 10 x-100 x 10 x-100 x x 83 x x 4 x x 4 x x 4 x 0 x x 10 x 100 x x 10 x x 100 x x x 10 x x 100 x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x 55 x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x 83 x x x x x x x x x x x x x x 55...

12 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 20:3320:33, 2 March 2023DG Regio talk contribs 89,388 bytes −44,195 Changed label, description and/or aliases in it, da, sk, cs, de, fi, el, ro, lv, bg, sl, ga, fr, lt, sv, es, pt, hu, et, mt, hr, nl, and other parts

3 November 2022

27 October 2022

26 October 2022

21 October 2022

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 21:2821:28, 2 December 2021DG Regio talk contribs 17,446 bytes +1,430 Created claim: summary (P836): Le projet a pour objet une mise en œuvre complète de la tâche, qui couvrira les éléments suivants: — L’installation de l’énergie solaire et de la pompe à chaleur (percepteur vertical 21 trousx100 m avec 2x52 kW unité de contrôle thermique) -School in Wrześnica — 3kWp installation photovoltaïque et conversion de la salle traditionnelle de la chaudière en salle de chaudière à granulés -L’installation de base à Varsovie-3 kp l’installation photovol...
  • curprev 21:2821:28, 2 December 2021DG Regio talk contribs 16,016 bytes +359 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:1919:19, 21 October 2020DG Regio talk contribs 16,096 bytes +285 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:1919:19, 21 October 2020DG Regio talk contribs 15,811 bytes −258 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:1919:19, 21 October 2020DG Regio talk contribs 16,069 bytes +3,992 Created claim: summary (P836): The subject of the project is the comprehensive implementation of the task, which will include the following elements: X-55 x x x x x x x x x x x x 83 x x x 21 x x 5 x 4 x 4 x 4 x 0 x 10 x-100 x 10 x-100 x x 83 x x 4 x x 4 x x 4 x 0 x x 10 x 100 x x 10 x x 100 x x x 10 x x 100 x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x 55 x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x 83 x x...
  • curprev 19:1919:19, 21 October 2020DG Regio talk contribs 12,077 bytes −2,189 Removed claim: summary (P836): The subject of the project is the comprehensive implementation of the task, which will include the following elements: - SP in Żuków - 10kWp photovoltaic installation and heat pump (vertical collector 21 holes x 100 m with a 2x52kW heat center) - School Complex in Wrześnica - photovoltaic installation power 3kWp and reconstruction of a traditional boiler room into a pellet boiler room - Primary School in Warszków - 3.12 kWp photovoltaic instal...

24 September 2020

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:4410:44, 11 March 2020Wildmax talk contribs 12,982 bytes +2,189 Created claim: summary (P836): The subject of the project is the comprehensive implementation of the task, which will include the following elements: - SP in Żuków - 10kWp photovoltaic installation and heat pump (vertical collector 21 holes x 100 m with a 2x52kW heat center) - School Complex in Wrześnica - photovoltaic installation power 3kWp and reconstruction of a traditional boiler room into a pellet boiler room - Primary School in Warszków - 3.12 kWp photovoltaic installa...

25 February 2020

18 February 2020

31 January 2020

14 January 2020