Revision history of "Solar power plant (photovoltaic) Broczyno" (Q137706)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:5015:50, 7 October 2024DG Regio talk contribs 88,507 bytes −8 Changed label, description and/or aliases in pt
  • curprev 15:5015:50, 7 October 2024DG Regio talk contribs 88,515 bytes +45 Set a claim value: summary (P836): O objeto do projeto é a construção de uma exploração fotovoltaica com uma capacidade total de até 1 MW, juntamente com a infraestrutura que a acompanha, que inclui: módulos fotovoltaicos, cablagem fixa e de corrente variável, caixas de ligação, contentor da estação de transformação, contentor técnico (armazenamento), estrada terrestre interna e área terrestre na área do terreno n.o 185/1 em Broczyno, Gm. Czaplinek. O projecto é estacionário. A eletr...

23 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 20:3320:33, 2 March 2023DG Regio talk contribs 85,296 bytes −619 Changed label, description and/or aliases in fr, ro, lv, da, it, et, lt, sk, de, sv, cs, bg, es, hr, fi, hu, sl, pt, ga, nl, el, mt, and other parts

27 October 2022

26 October 2022

21 October 2022

3 July 2022

  • curprev 01:0401:04, 3 July 2022DG Regio talk contribs 83,796 bytes +54,128 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 21:2821:28, 2 December 2021DG Regio talk contribs 17,355 bytes +3,142 Created claim: summary (P836): L’objet du projet est la construction d’une exploitation photovoltaïque d’une capacité totale allant jusqu’à 1 MW, ainsi que des infrastructures d’accompagnement, comprenant: modules photovoltaïques, câblage à courant fixe et à courant variable, boîtes de jonction, conteneur de poste de transformateur, conteneur technique (entrepôt), route terrestre intérieure et carré de sol dans la zone de la parcelle no 185/1 dans le village de Broczyno, Czap...
  • curprev 21:2821:28, 2 December 2021DG Regio talk contribs 14,213 bytes +102 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:1919:19, 21 October 2020DG Regio talk contribs 14,550 bytes +100 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:1919:19, 21 October 2020DG Regio talk contribs 14,450 bytes −105 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:1919:19, 21 October 2020DG Regio talk contribs 14,555 bytes +2,813 Created claim: summary (P836): The subject of the project is the construction of a photovoltaic farm with a total capacity of up to 1 MW together with the accompanying infrastructure, which includes: photovoltaic modules, fixed and variable-current wiring, connection boxes, transformer station container, technical container (storage), internal ground road and ground area on the area of the plot no. 185/1 in Broczyno, Gm. Czaplinek. The project is stationary. The electricity p...
  • curprev 19:1919:19, 21 October 2020DG Regio talk contribs 11,742 bytes −2,218 Removed claim: summary (P836): The project involves the construction of a PV farm with a total capacity of up to 1 MW with an accompanying infrastructure consisting of: solar modules, wiring and retrofit plants, junction boxes, transformer station container, technical container (storage), internal ground road and land site on land part of the plot No 185/1 in Bczyno, Czapplotinek. The project is stationary. The electricity produced in it will be fed into the electricity gri...

24 September 2020

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:0510:05, 11 March 2020DG Regio talk contribs 12,677 bytes +2,218 Created claim: summary (P836): The project involves the construction of a PV farm with a total capacity of up to 1 MW with an accompanying infrastructure consisting of: solar modules, wiring and retrofit plants, junction boxes, transformer station container, technical container (storage), internal ground road and land site on land part of the plot No 185/1 in Bczyno, Czapplotinek. The project is stationary. The electricity produced in it will be fed into the electricity grid...

25 February 2020

18 February 2020

31 January 2020

14 January 2020