Revision history of "Construction of 900 kW photovoltaic power plant in Turów" (Q137703)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 16:3916:39, 10 October 2024DG Regio talk contribs 59,550 bytes −45 Set a claim value: summary (P836): O projeto tem por objeto a construção de uma central fotovoltaica com uma capacidade de 900 kW, juntamente com a infraestrutura que acompanha a parcela 8/55 em Turowo, no município rural de Szczecinek, distrito de Szczecinek, voivodato de Zachodniopomorskie. A instalação será colocada no solo nas proximidades das obras de construção existentes. O investimento incluirá: instalação de painéis fotovoltaicos no solo, execução de instalação de energia ex...

22 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 20:3320:33, 2 March 2023DG Regio talk contribs 56,421 bytes +423 Changed label, description and/or aliases in da, it, sk, et, bg, lv, lt, fr, es, ga, hr, pt, sv, de, fi, ro, cs, nl, sl, el, mt, hu, and other parts

27 October 2022

26 October 2022

21 October 2022

27 July 2022

  • curprev 18:2918:29, 27 July 2022DG Regio talk contribs 53,874 bytes +33,038 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 21:2721:27, 2 December 2021DG Regio talk contribs 13,691 bytes +1,683 Created claim: summary (P836): Le projet concerne la construction d’une centrale photovoltaïque de 900 kW accompagnée d’une infrastructure sur le terrain 8/55 à Turowo, commune rurale de Szczecinek, district de Szczeecinecki, voïvodie de Zachodniopomorskie. L’installation sera placée au sol à proximité des bâtiments existants. L’investissement comprendra: installation de panneaux photovoltaïques au sol, exécution d’une installation d’énergie externe, fondation d’un conteneur...
  • curprev 21:2721:27, 2 December 2021DG Regio talk contribs 12,008 bytes +125 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:0919:09, 21 October 2020DG Regio talk contribs 12,322 bytes +116 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:0919:09, 21 October 2020DG Regio talk contribs 12,206 bytes −119 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:0919:09, 21 October 2020DG Regio talk contribs 12,325 bytes +1,698 Created claim: summary (P836): The subject of the project is the construction of a photovoltaic power plant with a capacity of 900 kW together with the infrastructure accompanying the plot 8/55 in Turowo, the rural commune Szczecinek, Szczecinek county, Zachodniopomorskie voivodship. The installation will be placed on the ground in the vicinity of existing construction works. The investment will include: installation of photovoltaic panels on the ground, execution of external...
  • curprev 19:0919:09, 21 October 2020DG Regio talk contribs 10,627 bytes −1,175 Removed claim: summary (P836): The project consists of the construction of a 900 kW photovoltaic power plant with associated infrastructure on plot 8/55 in Turowo, the municipality of Szczecin, the District of Szczecinek, the province of Zachodniopomorskie Province. The installation will be located in the vicinity of existing construction works. The investment will include: installation of solar panels on the ground, performance of an external energy installation, subdivisi...

24 September 2020

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:0510:05, 11 March 2020DG Regio talk contribs 10,511 bytes +1,175 Created claim: summary (P836): The project consists of the construction of a 900 kW photovoltaic power plant with associated infrastructure on plot 8/55 in Turowo, the municipality of Szczecin, the District of Szczecinek, the province of Zachodniopomorskie Province. The installation will be located in the vicinity of existing construction works. The investment will include: installation of solar panels on the ground, performance of an external energy installation, subdivision...

25 February 2020

18 February 2020

31 January 2020

14 January 2020