Revision history of "“Increasing the share of renewable energy in the West Pomeranian Voivodeship through the construction of a photovoltaic farm with a capacity of 687.5 kWp”" (Q137698)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:2606:26, 9 October 2024DG Regio talk contribs 57,868 bytes −1 Changed label, description and/or aliases in pt
  • curprev 06:2606:26, 9 October 2024DG Regio talk contribs 57,869 bytes +13 Set a claim value: summary (P836): A alteração da data de implementação do projeto deve-se à necessidade de documentação técnica e à construção da Trafostation, que permitirá a ligação da instalação fotovoltaica à rede elétrica. A data de construção da exploração fotovoltaica é adiada para 2.10.2017 e a sua conclusão para 30.4.2018. A mudança no custo da construção de estradas de acesso deve-se à mudança na tecnologia de fabricação. De acordo com o pedido, o valor da despesa é: 1 107...

7 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 23:3823:38, 2 March 2023DG Regio talk contribs 54,682 bytes −646 Changed label, description and/or aliases in bg, cs, da, de, el, es, et, fi, fr, ga, hr, hu, it, lt, lv, mt, nl, pt, ro, sk, sl, sv, and other parts

27 October 2022

26 October 2022

21 October 2022

3 July 2022

  • curprev 01:0401:04, 3 July 2022DG Regio talk contribs 53,206 bytes +32,314 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 21:2721:27, 2 December 2021DG Regio talk contribs 13,594 bytes +1,621 Created claim: summary (P836): La modification du délai de mise en œuvre du projet est due à la nécessité d’effectuer la documentation technique et la construction d’une Trafostation, qui permettra le raccordement de l’installation photovoltaïque au réseau électrique. La date de début de la construction de la ferme photovoltaïque est reportée au 02.10.2017 et la date de fin au 30.04.2018. La modification du coût des routes d’accès à la construction est liée à un changement de...
  • curprev 21:2721:27, 2 December 2021DG Regio talk contribs 11,973 bytes +251 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:0919:09, 21 October 2020DG Regio talk contribs 12,161 bytes +218 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:0919:09, 21 October 2020DG Regio talk contribs 11,943 bytes −192 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:0919:09, 21 October 2020DG Regio talk contribs 12,135 bytes +1,540 Created claim: summary (P836): The change in the date of implementation of the project is due to the need for technical documentation and the construction of Trafostation, which will enable the connection of the photovoltaic installation to the power grid. The date of construction of the PV farm is postponed to 02.10.2017 and the completion to 30.04.2018. The change in the cost of the construction of access roads is due to the change in manufacturing technology. According to...
  • curprev 19:0919:09, 21 October 2020DG Regio talk contribs 10,595 bytes −1,091 Removed claim: summary (P836): The change in the timing of the project is due to the need to complete the technical documentation and the construction of a hit that will enable the installation of the photovoltaic installation into the electricity grid. The start date of the construction of the PV farm is postponed to 02.10.2017 and the termination on 30.04.2018. the change in the costs of construction of access roads is linked to the change in technology of execution. The...

24 September 2020

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:0510:05, 11 March 2020DG Regio talk contribs 10,398 bytes +1,091 Created claim: summary (P836): The change in the timing of the project is due to the need to complete the technical documentation and the construction of a hit that will enable the installation of the photovoltaic installation into the electricity grid. The start date of the construction of the PV farm is postponed to 02.10.2017 and the termination on 30.04.2018. the change in the costs of construction of access roads is linked to the change in technology of execution. The am...

25 February 2020

18 February 2020

31 January 2020

14 January 2020