Revision history of "Construction by Przedsiębiorstwo Usług Komunalnych Sp. z o.o. of a photovoltaic installation on water estimation in Gryfin" (Q137697)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 04:1804:18, 11 October 2024DG Regio talk contribs 83,503 bytes −5 Changed label, description and/or aliases in pt
  • curprev 04:1804:18, 11 October 2024DG Regio talk contribs 83,508 bytes −67 Set a claim value: summary (P836): O projecto consistirá na construção de uma instalação fotovoltaica com uma potência de 99,68kWp na área de uma água recta em Gryfin. O projecto é estacionário. O objeto do investimento é o desenvolvimento de um terreno para a construção de uma instalação fotovoltaica com uma capacidade de 99,98 kW – 356 células fotovoltaicas com uma capacidade de 280 Wp cada. Presume-se que a área de instalação de uma instalação fotovoltaica não excede 2000 m2. A el...

7 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 16:4216:42, 2 March 2023DG Regio talk contribs 80,401 bytes +1,136 Changed label, description and/or aliases in lv, da, sk, ro, pt, cs, et, de, sv, lt, bg, ga, hu, sl, es, hr, mt, fr, nl, el, fi, it, and other parts

27 October 2022

26 October 2022

21 October 2022

27 July 2022

  • curprev 18:2918:29, 27 July 2022DG Regio talk contribs 77,139 bytes +48,914 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 21:2721:27, 2 December 2021DG Regio talk contribs 16,579 bytes +2,710 Created claim: summary (P836): Le projet consistera en la construction d’une installation photovoltaïque d’une capacité de 99,68 kWp sur le site de captage d’eau de TYWA à Gryfin. Le projet est stationnaire. L’objet de l’investissement est le développement du terrain pour la construction d’une installation photovoltaïque d’une capacité de 99,98 kW — 356 cellules photovoltaïques d’une capacité de 280 Wp chacune. Une surface d’une installation photovoltaïque ne dépassant pas 2 ...
  • curprev 21:2721:27, 2 December 2021DG Regio talk contribs 13,869 bytes +195 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:0919:09, 21 October 2020DG Regio talk contribs 14,113 bytes +184 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:0919:09, 21 October 2020DG Regio talk contribs 13,929 bytes −120 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:0919:09, 21 October 2020DG Regio talk contribs 14,049 bytes +2,510 Created claim: summary (P836): The project will consist of the construction of a photovoltaic installation with a power of 99.68kWp in the area of a straight water in Gryfin. The project is stationary. The subject of the investment is the development of a plot for the construction of a photovoltaic installation with a capacity of 99.98 kW – 356 photovoltaic cells with a capacity of 280Wp each. The installation area of a photovoltaic installation not exceeding 2000 m² shall be...
  • curprev 19:0919:09, 21 October 2020DG Regio talk contribs 11,539 bytes −2,065 Removed claim: summary (P836): The project will consist of the construction of a 99,68kWp photovoltaic power plant on the water intake area in Gryfinno. The project is stationary. The subject of the investment is the installation of a plot of land for the construction of a PV power of 99.98 kW — 356 PV cells under 280Wp each. The surface of the installation of a photovoltaic installation does not exceed 2 000 m². The electricity produced by the solar cells produced by the s...

24 September 2020

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:0510:05, 11 March 2020DG Regio talk contribs 12,329 bytes +2,065 Created claim: summary (P836): The project will consist of the construction of a 99,68kWp photovoltaic power plant on the water intake area in Gryfinno. The project is stationary. The subject of the investment is the installation of a plot of land for the construction of a PV power of 99.98 kW — 356 PV cells under 280Wp each. The surface of the installation of a photovoltaic installation does not exceed 2 000 m². The electricity produced by the solar cells produced by the sol...

25 February 2020

18 February 2020

31 January 2020

14 January 2020