Revision history of "Construction of photovoltaic installations and heat pumps on waste water treatment plant in Płoty" (Q137686)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 05:4605:46, 10 October 2024DG Regio talk contribs 84,517 bytes −6 Changed label, description and/or aliases in pt
  • curprev 05:4605:46, 10 October 2024DG Regio talk contribs 84,523 bytes −35 Set a claim value: summary (P836): O projecto será implementado na área de Intervenção Estratégica (SSW).O objecto do projecto é a construção de uma instalação fotovoltaica com uma potência de 300,16 kW e as bombas de calor com uma potência de 60,10 kW.A energia eléctrica sob a forma de corrente contínua produzida por células fotovoltaicas será transformada pelo inversor pelo inversor na corrente alternada. ETAPAS DE EXECUÇÃO DO PROJETO: 1.Preparação da documentação do projeto, inclu...

20 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 20:3320:33, 2 March 2023DG Regio talk contribs 81,384 bytes −211 Changed label, description and/or aliases in lv, da, sk, it, cs, et, fr, hu, el, ga, ro, fi, bg, pt, lt, sv, nl, hr, mt, es, sl, de, and other parts

27 October 2022

26 October 2022

21 October 2022

3 July 2022

  • curprev 01:0201:02, 3 July 2022DG Regio talk contribs 79,475 bytes +50,341 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 21:2721:27, 2 December 2021DG Regio talk contribs 17,057 bytes +2,940 Created claim: summary (P836): Le projet est stationnaire. Le site est situé à Płoty, rue Koszalinska, sur le site de la station d’épuration des eaux usées. Le projet sera réalisé dans le domaine de l’intervention stratégique (SSW). L’objet du projet est la construction d’une installation photovoltaïque d’une puissance de 300,16 kW et de pompes à chaleur d’une puissance de 60,10 kW.L’énergie électrique sous forme de courant continu produit par des cellules photovoltaïques ser...
  • curprev 21:2721:27, 2 December 2021DG Regio talk contribs 14,117 bytes +189 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:0919:09, 21 October 2020DG Regio talk contribs 14,367 bytes +157 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:0919:09, 21 October 2020DG Regio talk contribs 14,210 bytes −141 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:0919:09, 21 October 2020DG Regio talk contribs 14,351 bytes +2,577 Created claim: summary (P836): The project will be implemented in the area of Strategic Intervention (SSW).The object of the project is the construction of a photovoltaic installation with a power of 300.16 kW and the heat pumps with a power of 60.10 kW.The electrical energy in the form of direct current produced by photovoltaic cells will be transformed by the inverter by the inverter on the alternating current. STAGES OF PROJECT IMPLEMENTATION: 1.Preparation of project docu...
  • curprev 19:0919:09, 21 October 2020DG Regio talk contribs 11,774 bytes −3,484 Removed claim: summary (P836): The project is based on the site. the construction site is located in m. the project is located on the site, located in m. the project will be built on the Site of Strategic Intervention (SSW). the project will be carried out in the area of the Strategic Intervention (SSW). the project will be carried out in the area of the Strategic Intervention (SSW). the project will be carried out in the area of the Strategic Intervention (SSW). the projec...

24 September 2020

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:0510:05, 11 March 2020DG Regio talk contribs 13,975 bytes +3,484 Created claim: summary (P836): The project is based on the site. the construction site is located in m. the project is located on the site, located in m. the project will be built on the Site of Strategic Intervention (SSW). the project will be carried out in the area of the Strategic Intervention (SSW). the project will be carried out in the area of the Strategic Intervention (SSW). the project will be carried out in the area of the Strategic Intervention (SSW). the project...

25 February 2020

18 February 2020

31 January 2020

14 January 2020