Revision history of "Freestanding photovoltaic installation with a maximum power of 0,95 MWp in Stare Czarnowo" (Q137685)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 05:4605:46, 10 October 2024DG Regio talk contribs 90,191 bytes −1 Changed label, description and/or aliases in pt
  • curprev 05:4605:46, 10 October 2024DG Regio talk contribs 90,192 bytes +8 Set a claim value: summary (P836): O projeto consistirá na plantação de uma instalação fotovoltaica com uma capacidade máxima de 0,95 MWp. O investimento será realizado em Stare Czarnowo, no condado de Gryfin. O projecto tem um carácter estacionário. O intervalo incluirá parcelas com números de 74/2, 78/12, 78/14. A área total para o investimento é de até 1,5 ha. A instalação será composta por 3652 módulos com dimensões aproximadas de 982 mm x 1670 mm e 260 Wp cada, montados em armaç...

22 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

21 October 2022

27 July 2022

  • curprev 18:2918:29, 27 July 2022DG Regio talk contribs 84,135 bytes +54,955 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 21:2721:27, 2 December 2021DG Regio talk contribs 17,292 bytes +2,933 Created claim: summary (P836): Le projet consistera à planter une installation photovoltaïque d’une capacité maximale de 0,95 MWc. L’investissement sera situé à Stare Czarnowo, dans le comté de Gryfin. Le projet est stationnaire. Il couvrira les colis portant les numéros 74/2, 78/12, 78/14. La superficie totale des investissements s’élève à 1,5 hectare. L’installation se composera de 3652 modules avec des dimensions d’env. 982 mm x 1 670 mm et puissance 260 Wp chacun, monté s...
  • curprev 21:2721:27, 2 December 2021DG Regio talk contribs 14,359 bytes +153 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:0919:09, 21 October 2020DG Regio talk contribs 14,645 bytes +148 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:0919:09, 21 October 2020DG Regio talk contribs 14,497 bytes −160 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:0919:09, 21 October 2020DG Regio talk contribs 14,657 bytes +2,750 Created claim: summary (P836): The project will consist of planting a photovoltaic installation with a maximum capacity of 0,95 MWp. The investment will be located in Stare Czarnowo, in the Gryfin County. The project has a stationary character. The range will include plots with numbers of 74/2, 78/12, 78/14. The total area for the investment is up to 1.5 ha. The installation will consist of 3652 modules with dimensions approx. 982 mm x 1670 mm and 260 Wp each, mounted on stan...
  • curprev 19:0919:09, 21 October 2020DG Regio talk contribs 11,907 bytes −2,363 Removed claim: summary (P836): The project will consist of the installation of photovoltaic installations with a maximum capacity of 0,95 MWp. The investment will be located in Stare Czarnecki, in the district of Gryfino. The project is stationary. Its coverage will consist of the parcels bearing numbers 74/2, 78/12, 78/14. The total area earmarked for the investment is up to 1.5 ha. The installation will consist of 3652 modules. 982 mm x 1 670 mm and with a power of 260 Wp...

24 September 2020

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:0510:05, 11 March 2020DG Regio talk contribs 12,988 bytes +2,363 Created claim: summary (P836): The project will consist of the installation of photovoltaic installations with a maximum capacity of 0,95 MWp. The investment will be located in Stare Czarnecki, in the district of Gryfino. The project is stationary. Its coverage will consist of the parcels bearing numbers 74/2, 78/12, 78/14. The total area earmarked for the investment is up to 1.5 ha. The installation will consist of 3652 modules. 982 mm x 1 670 mm and with a power of 260 Wp e...

25 February 2020

18 February 2020

31 January 2020

14 January 2020