Revision history of "Energy modernisation of 6 Housing Buildings SM Piast in Barlink" (Q137646)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:3018:30, 9 October 2024DG Regio talk contribs 84,781 bytes −2 Changed label, description and/or aliases in pt
  • curprev 18:3018:30, 9 October 2024DG Regio talk contribs 84,783 bytes −658 Set a claim value: summary (P836): No âmbito do investimento, está prevista a modernização energética de 6 edifícios incluídos na cooperativa de habitação «Piast», em Barlink, em ul. Upper 28,Castral 1, Judicial No.1 e No.2, Lake 2,Chmielna 1.As obras incluirão a modernização térmica de edifícios na gama de:1)aquecimento de divisórias exteriores:paredes longitudinais, paredes de pico, balaustradas e loggia,2)estrópodes, tetos sobre garagens e adegas,3)mudança de carpintaria de janela...

22 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 19:0119:01, 2 March 2023DG Regio talk contribs 82,267 bytes +11,177 Changed label, description and/or aliases in da, it, sk, hr, de, ga, et, pt, fi, lv, lt, sv, fr, es, ro, hu, el, nl, cs, sl, bg, mt, and other parts

27 October 2022

26 October 2022

21 October 2022

3 July 2022

  • curprev 01:0001:00, 3 July 2022DG Regio talk contribs 68,966 bytes +41,174 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 21:2821:28, 2 December 2021DG Regio talk contribs 16,336 bytes +2,844 Created claim: summary (P836): Dans le cadre de l’investissement, 6 bâtiments inclus dans la coopérative d’habitation «Piast» à BarLink à ul. Supérieur 28,Kościelna 1, Cour No 1 et No 2, Lac 2, Chmielna 1.Les travaux comprendront la thermomodernisation des bâtiments dans la gamme de: 1) le réchauffement des cloisons extérieures: murs longitudinaux, murs de crête, balustrades et loggias, 2) les tropodes, les plafonds sur les garages et les caves, 3) le remplacement de la menui...
  • curprev 21:2821:28, 2 December 2021DG Regio talk contribs 13,492 bytes +136 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:0819:08, 21 October 2020DG Regio talk contribs 13,795 bytes +122 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:0819:08, 21 October 2020DG Regio talk contribs 13,673 bytes −121 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:0819:08, 21 October 2020DG Regio talk contribs 13,794 bytes +2,046 Created claim: summary (P836): As part of the investment, the energy modernisation of 6 buildings included in the “Piast” Housing Cooperative in Barlink is planned at ul. Upper 28,Castral 1, Judicial No.1 and No.2, Lake 2,Chmielna 1.Works will include thermal modernisation of buildings in the range of:1)warming of outer partitions:longitudinal walls, peak walls, balustrades and loggia,2)stropods, ceilings over garages and cellars,3)change of window carpentry in common parts o...
  • curprev 19:0819:08, 21 October 2020DG Regio talk contribs 11,748 bytes −2,165 Removed claim: summary (P836): As part of the investment, the 6 buildings of the “Piast” Housing Cooperative are planned to be upgraded at ul. Upper 28, Church 1, Judiciary 1 and 2, Jeziorna 2, Chmie1.Work will cover the thermal modernisation of the buildings in the areas of: 1) the warming of the buildings in the areas of: 2) the warming of the building envelope: the walls of the walls, the tops, the balustrades and the cellars, (3) the replacement of window frames in comm...

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:0410:04, 11 March 2020DG Regio talk contribs 12,619 bytes +2,165 Created claim: summary (P836): As part of the investment, the 6 buildings of the “Piast” Housing Cooperative are planned to be upgraded at ul. Upper 28, Church 1, Judiciary 1 and 2, Jeziorna 2, Chmie1.Work will cover the thermal modernisation of the buildings in the areas of: 1) the warming of the buildings in the areas of: 2) the warming of the building envelope: the walls of the walls, the tops, the balustrades and the cellars, (3) the replacement of window frames in common...

25 February 2020

18 February 2020

31 January 2020

14 January 2020