Revision history of "Thermal modernisation of the existing primary school building in Sowa" (Q137639)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 20:3320:33, 2 March 2023DG Regio talk contribs 79,885 bytes +23,880 Changed label, description and/or aliases in da, it, sk, fr, el, hr, sv, ga, lv, bg, ro, fi, hu, de, et, cs, pt, es, lt, sl, nl, mt, and other parts

27 October 2022

26 October 2022

21 October 2022

3 July 2022

  • curprev 00:5900:59, 3 July 2022DG Regio talk contribs 53,885 bytes +27,148 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 21:3021:30, 2 December 2021DG Regio talk contribs 15,556 bytes +2,719 Created claim: summary (P836): L’objet de l’étude est d’effectuer des travaux de thermomodernisation dans le bâtiment public SP dans le marais à ul.Szkolna 4,G.Stargard, à savoir: 1)Le plancher au sol de l’addition-isolation avec une épaisseur de polystyrène 0,2 m.Pow.Lors du réchauffement jusqu’à 510 m².2)le plancher au sol dans le sous-sol de l’épaisseur de polystyrène 0,15 m.Pow.Lors du réchauffement jusqu’à 180 m².3) les tropodes sur le segment principal-isolation de épai...
  • curprev 21:3021:30, 2 December 2021DG Regio talk contribs 12,837 bytes +132 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:0819:08, 21 October 2020DG Regio talk contribs 13,144 bytes +128 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:0819:08, 21 October 2020DG Regio talk contribs 13,016 bytes −133 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:0819:08, 21 October 2020DG Regio talk contribs 13,149 bytes +1,372 Created claim: summary (P836): The floor of the roof-intra-warming, the thickness of 0.2 m.Pow. to warming up-510 m².2) floor in the basement-warming, thickness of 0,15 m.Pow. dot.180 m²) floor on the ground in the basement-warming of the St. The rest of the volume of the work of the interior of the system is the improvement of the installation of the hot water pump.(installation of the heat pump).Improvement of the installation of the hot water system is necessary for the di...
  • curprev 19:0819:08, 21 October 2020DG Regio talk contribs 11,777 bytes −1,291 Removed claim: summary (P836): The subject of the study is the renovation of the works to be carried out in the buildings of the Public Private Building (SP 4) at the ul.School building 1, G.Stargard, namely: (0,2) the floor on the basis of a 510.g.2./0,15/heat-thickness contact floor on the ground in the basement, covering a thickness of 180 m.Po.insulation 3 m². (0,2) the sharing of window frames with a thickness of 197 m.d.4/0,2) the exchange of doors to a new U = 335,00...

24 September 2020

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:0410:04, 11 March 2020DG Regio talk contribs 11,785 bytes +1,291 Created claim: summary (P836): The subject of the study is the renovation of the works to be carried out in the buildings of the Public Private Building (SP 4) at the ul.School building 1, G.Stargard, namely: (0,2) the floor on the basis of a 510.g.2./0,15/heat-thickness contact floor on the ground in the basement, covering a thickness of 180 m.Po.insulation 3 m². (0,2) the sharing of window frames with a thickness of 197 m.d.4/0,2) the exchange of doors to a new U = 335,00.F...

25 February 2020

18 February 2020

31 January 2020

14 January 2020